My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - RFP for Land
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-07-23
>
#04 - RFP for Land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:08:35 PM
Creation date
9/29/2025 1:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />11 NorthPoint Industrial Park – Lake Elmo, MN │Traffic Analysis <br />January 2022 <br /> <br />TABLE 6: BUILD SCENARIO 2 PHASE 2 TRIP GENERATION SUMMARY <br />Land Use Description <br />ITE Land <br />Use Code <br />(LUC) <br />Intensity/ <br />U nits Vehicle Type Daily <br />Trips <br />AM Peak Hour PM Peak Hour <br />In Out Total In Out Total <br />Horizon Year (2040) <br />High-Cube Transload and Short- <br />Term Storage Warehouse 154 1,557,380 <br />Square Feet <br />Passenger Vehicles 1,840 85 15 95 40 105 140 <br />Trucks 340 15 15 30 5 10 15 <br />Shopping Plaza (>150ksf) 820 178,596 <br />Square Feet Passenger Vehicles 6,610 95 55 150 290 315 605 <br />Single Family Detached Housing 210 38 <br />Dwelling Units Passenger Vehicles 360 5 20 25 25 15 40 <br />Multifamily Housing (Low-Rise) 220 124 <br />Dwelling Units Passenger Vehicles 835 10 40 50 40 25 65 <br />Multifamily Housing (Mid-Rise) 221 210 <br />Dwelling Units Passenger Vehicles 955 20 60 80 50 30 80 <br />Total Passenger Vehicle Trips 10,600 215 190 400 445 490 925 <br />Total Truck Trips 340 15 15 30 5 10 15 <br />Total Rounded Trips 10,940 230 200 430 450 495 925 <br />Table 7 provides a summary of trip generation for development phase 2 of Scenario 3, this is a cumulative <br />table, and includes development from phase 1. Based on the trip generation calculation, phase 2 of scenario <br />3 is anticipated to generate 380 total trips during the AM Peak Hour (250 entering and 130 exiting), 750 <br />total trips during the PM Peak Hour (330 entering, 420 exiting), and 9,790 total daily trips. <br />TABLE 7: BUILD SCENARIO 3 PHASE 2 TRIP GENERATION SUMMARY <br />Land Use Description <br />ITE Land <br />Use Code <br />(LUC) <br />Intensity/ <br />Units Vehicle Type Daily <br />Trips <br />AM Peak Hour PM Peak Hour <br />In Out Total In Out Total <br />Horizon Year (2040) <br />High-Cube Transload and Short- <br />Term Storage Warehouse 154 2,200,000 <br />Square Feet <br />Passenger Vehicles 2600 120 20 140 50 150 200 <br />Trucks 480 20 20 40 10 10 20 <br />Shopping Plaza (40-150ksf) 821 91,500 <br />Square Feet Passenger Vehicles 6,180 100 60 160 235 240 475 <br />Single Family Detached Housing 210 56 <br />Dwelling Units Passenger Vehicles 530 10 30 40 35 20 55 <br />Total Passenger Vehicle Trips 9,310 230 110 340 320 410 730 <br />Total Truck Trips 480 20 20 40 10 10 20 <br />Total Rounded Trips 9,790 250 130 380 330 420 750 <br />Table 8 provides a summary of trip generation for development phase 2 of Scenario 4, this is a cumulative <br />table, and includes development from phase 1. Based on the trip generation calculation, phase 2 of scenario <br />4 is anticipated to generate 95 total trips during the AM Peak Hour (70 entering and 25 exiting), 120 total <br />trips during the PM Peak Hour (35 entering, 85 exiting), and 1,635 total daily trips.
The URL can be used to link to this page
Your browser does not support the video tag.