Laserfiche WebLink
  PAGE 2 of 4  <br />on the plans. The Site plans must also be revised as needed to preserve all easements along the public  <br />right‐of‐way for use by small/dry utilities, free from encroachments and at grades that do not exceed 4:1.  <br /> A 10‐ft drainage and utility easement abutting the full length of the Hudson Boulevard right‐of‐way  <br />must be provided as part of the Final Plat on both the north and south sides of the roadway.  <br /> All easements must be shown on the site plans for the Dairy Queen Store. The Site plans must be  <br />revised to remove all easement encroachments.  <br />4. The drainage and utility easement along the south property line of Lot 3, Block 2 must be increased to 40‐ <br />feet to fully incorporate and protect the proposed drainage swale.  <br />5. The drainage and utility easement over the East Infiltration basin (Lots 2 and 3, Block 2) must be revised  <br />to incorporate the 100‐year HWL elevation/contour, and to incorporate the BMP maintenance access  <br />road needed to access both the storm sewer inlet and outfall structures. The BMP access road must be  <br />provided in accordance with the city engineering design standards.  <br />6. The drainage and utility easement at the northeast corner of Lot 2, Block must be revised to maintain a  <br />minimum distance of 15‐feet from the storm sewer run from STMH 710 to FES 700.  <br />7. The drainage and utility easements over Lot 1, Block 2 must be revised to fully incorporate the 100‐year  <br />HWL elevation/contour for  the  SE Pond, including the BMP maintenance  access  road to  the pond  <br />maintenance bench. The BMP access road must be provided in accordance with the city engineering  <br />design standards.  <br />8. Drainage and utility easements over Lot 1, Block 2 must be provided to fully incorporate the drainage  <br />pathways and 100‐year HWL elevations/contours for the localized low areas from FES 300 to FES 210. The  <br />100‐year HWL elevation and contour for each localized low area must be shown on the grading plans.  <br />9. A dedicated drainage and utility easements must be provided over the existing wetland, including the  <br />100‐year HWL and wetland buffer. The post development 100‐year HWL elevation and contour for the  <br />wetland must be shown on the grading plans.  <br />10. Public watermain and sanitary sewer easements must be provided to maintain a minimum 15‐ft from  <br />centerline of pipe/hydrant or pipe/structure in all directions. Utility easements must be free from all  <br />encroachments, including retaining walls, trees, other small/dry utilities, or storm water management  <br />BMPs. Easements must be dedicated to the city as part of the plat. Dedicated watermain and sanitary  <br />sewer easements must be shown on all site, grading, utility, and landscape plans when submitting a  <br />Preliminary and Final Plat application.  <br /> Private utilities internal to the site (gas/electric/telecom) must be relocated outside of the dedicated  <br />water/sewer easements.  <br /> Watermain and sanitary sewer easement revisions are necessary to cover all proposed hydrants and  <br />the water/sewer service stubs to Lot 3, Block 2.  <br /> Easement revisions may be necessary to reflect any changes to the utility layout and alignments,  <br />including Lot 1, Block 1 on the south side of Hudson Boulevard.  <br />11. The storm water pond, infiltration basin and underground storm water BMP will remain privately owned  <br />and maintained. As part of the development approvals, the applicant(s) will be required to sign a Storm  <br />Water Maintenance and Easement Agreement in the city’s standard form of agreement. The storm water  <br />BMPs must be shown on the Preliminary Plat, site plans, utility plans and grading plans, including the 100‐ <br />year high water level areas, maintenance access roadways and maintenance benches.   <br /> The Preliminary Plat, and site plans must be revised to include the underground storm water BMP for  <br />Lot 1, Block 1.  <br />12. All  off‐site permanent and temporary easements necessary to construct the proposed  subdivision  <br />improvements must be acquired and provided to the city prior to the approval of the construction plans.  <br />Each easement must be provided in the city standard form of easement agreement.  <br /> A permanent off‐site drainage and utility easement is required for the proposed storm sewer run  <br />from STMH 501 to FES 500 and to incorporate the 100‐year HWL elevation.  <br /> A temporary construction easement is needed to facilitate the construction and grading for FES 700.  <br />13. No Outlots are proposed as part of the Preliminary and Final Plat.  <br />  <br />