  PAGE 4 of 4  <br />3. The SWMP will be required to verify that rate control and volume control requirements are met for all  <br />points of discharge from the site, and for each phase of the subdivision build‐out. The existing and  <br />proposed drainage exhibits must be revised to label all points of discharge from the site. The SWMP rate  <br />control summary tables must reference each discharge location independently and combined using the  <br />same labeling as depicted on the exhibits. SWMP revisions are necessary to provide rate control for all  <br />points of discharge and for all storm events.  <br />4. Soil borings are required in accordance with the City Engineering Design Standards Manual dated January  <br />2022 to determine the design infiltration rates. Borings must be taken as part of the SWMP submitted for  <br />preliminary and final plat and must be taken within the foot print of the proposed basin.  <br /> Infiltration rates used for design purposes must be based on actual soil borings taken within the  <br />proposed BMP footprint. Soil borings are required in the number and depth as outlined in the City  <br />Engineering Design Standards. Geotechnical reports must provide analysis and recommendations on  <br />proposed design infiltration rates.  <br /> The assumed infiltration rate for the proposed underground infiltration system must be revised to be  <br />at a rate of 50% of the recommended infiltration rate based on actual soil borings.  <br /> A  soil boring map must  be included  in the Geotechnical Reports and overlaying the proposed  <br />improvements to detail soil boring locations relative to the proposed BMPs.  <br />5. The SWMP must be revised to provide a summary table of all proposed site BMPs necessary to provide  <br />storm water management for the Project. The table must label each BMP consistent with the project  <br />plans and must identify the 100‐year HWL elevation for each BMP.  <br />6. The storm  water facilities constructed for this development should remain privately  owned and  <br />maintained. The applicant will be required to execute and record a  Stormwater Maintenance and  <br />Easement Agreement in the City’s standard form of agreement. The grading plans must indicate that the  <br />storm water  basins are “Privately Owned and Maintained” and  to include the drainage and utility  <br />easement areas.  <br />7. The grading plans must be revised to show all emergency overflow (EOF) locations and elevations for all  <br />BMPs and localized low areas. All EOFs and flow pathways must be protected by easement.  <br />8. Revise the storm sewer layout as necessary to maintain all discharge velocities to be less than 5 fps. The  <br />storm sewer calculations show FES 200 at 10.3 fps and FES 300 at 6.3 fps. The Dairy Queen storm sewer  <br />calculations show the FES discharge to be 6.41 fps. Storm sewer calculations must be updated to include  <br />all proposed storm sewer pipe runs. The diary queen store pipe discharge   <br />9. Revise the storm sewer pipe from CBMH‐202 to MH‐201 to be minimum 15‐inch RCP.  <br />10. Revise the DQ storm sewer pipe run from STMH 109 to FES to be minimum 15‐inch RCP.  <br />  <br />MUNICIPAL WATER AND SANITARY SEWER  <br />1. Public watermain and sanitary sewer are available to serve the subdivision with existing utilities located in  <br />the Hudson Boulevard right‐of‐way. The developer will be responsible for all costs to extend utilities  <br />within and throughout the subdivision to fully serve each proposed lot.  <br />2. Hydrant locations and system valves must be placed internal to the site as directed by the Lake Elmo  <br />Public Works and Fire Departments. Plan and easement revisions will be required accordingly. All internal  <br />site hydrants, and watermains feeding any hydrant, will remain city owned and operated. Minimum 30‐ <br />foot easements centered over the pipe/hydrant will be required without encroachments.  <br />3. The watermain and sanitary sewer plans must be revised to specify the public watermain and public  <br />sewer mains vs. the “begin location” for each private water/sewer service to each lot. A curb‐stop or gate  <br />valve is required and the end point of the public watermain and each private service must be clearly  <br />labeled. Plan notes must be added to indicate that the private water/sewer services are to be constructed  <br />per state building code.  <br />4. The applicant  has indicated  that the estimated WAC and SAC units  for the subdivision include 19  <br />WAC/SAC units for the auto service and office, 10 WAC/SAC units for the restaurant, and an additional 30  <br />WAC/SAC units for the future development of Lots 2 and 3, Block 2. In addition, the estimated fire flow  <br />demand has been reported to be 1,200 GPM for a 4‐hour duration.  <br />