My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Drake and DQ Preliminary Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-21-23
>
#11 - Drake and DQ Preliminary Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:23:40 PM
Creation date
9/29/2025 1:20:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 4 of 4 <br />3. The SWMP will be required to verify that rate control and volume control requirements are met for all <br />points of discharge from the site, and for each phase of the subdivision build‐out. The existing and <br />proposed drainage exhibits must be revised to label all points of discharge from the site. The SWMP rate <br />control summary tables must reference each discharge location independently and combined using the <br />same labeling as depicted on the exhibits. SWMP revisions are necessary to provide rate control for all <br />points of discharge and for all storm events. <br />4. Soil borings are required in accordance with the City Engineering Design Standards Manual dated January <br />2022 to determine the design infiltration rates. Borings must be taken as part of the SWMP submitted for <br />preliminary and final plat and must be taken within the foot print of the proposed basin. <br /> Infiltration rates used for design purposes must be based on actual soil borings taken within the <br />proposed BMP footprint. Soil borings are required in the number and depth as outlined in the City <br />Engineering Design Standards. Geotechnical reports must provide analysis and recommendations on <br />proposed design infiltration rates. <br /> The assumed infiltration rate for the proposed underground infiltration system must be revised to be <br />at a rate of 50% of the recommended infiltration rate based on actual soil borings. <br /> A soil boring map must be included in the Geotechnical Reports and overlaying the proposed <br />improvements to detail soil boring locations relative to the proposed BMPs. <br />5. The SWMP must be revised to provide a summary table of all proposed site BMPs necessary to provide <br />storm water management for the Project. The table must label each BMP consistent with the project <br />plans and must identify the 100‐year HWL elevation for each BMP. <br />6. The storm water facilities constructed for this development should remain privately owned and <br />maintained. The applicant will be required to execute and record a Stormwater Maintenance and <br />Easement Agreement in the City’s standard form of agreement. The grading plans must indicate that the <br />storm water basins are “Privately Owned and Maintained” and to include the drainage and utility <br />easement areas. <br />7. The grading plans must be revised to show all emergency overflow (EOF) locations and elevations for all <br />BMPs and localized low areas. All EOFs and flow pathways must be protected by easement. <br />8. Revise the storm sewer layout as necessary to maintain all discharge velocities to be less than 5 fps. The <br />storm sewer calculations show FES 200 at 10.3 fps and FES 300 at 6.3 fps. The Dairy Queen storm sewer <br />calculations show the FES discharge to be 6.41 fps. Storm sewer calculations must be updated to include <br />all proposed storm sewer pipe runs. The diary queen store pipe discharge <br />9. Revise the storm sewer pipe from CBMH‐202 to MH‐201 to be minimum 15‐inch RCP. <br />10. Revise the DQ storm sewer pipe run from STMH 109 to FES to be minimum 15‐inch RCP. <br /> <br />MUNICIPAL WATER AND SANITARY SEWER <br />1. Public watermain and sanitary sewer are available to serve the subdivision with existing utilities located in <br />the Hudson Boulevard right‐of‐way. The developer will be responsible for all costs to extend utilities <br />within and throughout the subdivision to fully serve each proposed lot. <br />2. Hydrant locations and system valves must be placed internal to the site as directed by the Lake Elmo <br />Public Works and Fire Departments. Plan and easement revisions will be required accordingly. All internal <br />site hydrants, and watermains feeding any hydrant, will remain city owned and operated. Minimum 30‐ <br />foot easements centered over the pipe/hydrant will be required without encroachments. <br />3. The watermain and sanitary sewer plans must be revised to specify the public watermain and public <br />sewer mains vs. the “begin location” for each private water/sewer service to each lot. A curb‐stop or gate <br />valve is required and the end point of the public watermain and each private service must be clearly <br />labeled. Plan notes must be added to indicate that the private water/sewer services are to be constructed <br />per state building code. <br />4. The applicant has indicated that the estimated WAC and SAC units for the subdivision include 19 <br />WAC/SAC units for the auto service and office, 10 WAC/SAC units for the restaurant, and an additional 30 <br />WAC/SAC units for the future development of Lots 2 and 3, Block 2. In addition, the estimated fire flow <br />demand has been reported to be 1,200 GPM for a 4‐hour duration. <br />