Laserfiche WebLink
Preliminary Plat <br />The proposed 2 lot/1 outlot preliminary plat reflects the design approved in PUD Concept in 1999. <br />No specific lot configuration was approved for this area by the PUD Concept Plan, but a short <br />public cul-de-sac street - such as now proposed — was a integral component of the approved to <br />the approved PUD Concept Plan. The actual street and underground infrastructure for the cul-de- <br />sac was designed by the City's engineering consultant on a City contract (developer paid), there <br />will be no issues regarding compliance with City infrastructure design standards. <br />Section 520 Site Plan <br />Staff has determined that the proposed site plan complies with applicable provisions of the GB <br />district, other applicable City Code standards and/or the approved PUD Plan, except as follows: <br />1. The approved PUD Plan specifies front and street minimum parking set back to be 20 <br />feet. The site plan depicts a 10 foot parking setback at one point along the 1-94 street <br />frontage and continuously along the cul-de-sac street frontage. <br />2. While not necessarily a factor of non-compliance, we note that the applicant proposes 158 <br />spaces of off-street parking where Code/PUD office parking minimums (1 space per 250 <br />square feet) yields 82 spaces. We are advised by the applicant that the additional parking <br />proposed relates to the school function. The "down side" of the additional parking is <br />increased impervious surface. We note, however, that even with the enhanced parking <br />proposal, the calculated site impervious remains within the 7517b allowable by BP <br />standards, and is factored in to the surface water plan for the entire Eagle Point Business <br />Park. <br />3. Review of the luminaire plan appears to reveal several points on the site that exceed the <br />3.0 foot candle maximum illumination beyond a 20 foot arc from the light source. Staff <br />suggests that the proposed fixtures either be reduced in number or relamped with less <br />intense bulbs than assumed by the luminaire plan. In addition, the applicant has proposed <br />exterior lighting within the public right-of-way of the cul-de-sac street — both in the <br />boulevard and in the street median. It has been City policy to not permit street lighting <br />except at designated intersections. A specific waiver of that policy would be required to <br />allow those ROW lights. <br />4. No landscape architect's estimate of the value of the proposed site landscape plan has <br />been provided at this time. While it appears that the landscaping proposed will comply <br />with the dollar minimums specified by Section 520, the required certification as to value <br />will be required prior to issuance of the building permit. <br />In accordance with the Eagle Point Business Park initial Development Agreement a Public Use <br />Dedication fee of $9,852 will be payable to the City prior to issuance of building permit. <br />Findings and Recommendations: <br />Staff finds the Preliminary Plat to be in compliance with the approved PUD Concept Plan, and the <br />design and engineering standards of the City. We recommend approval of the preliminary plat <br />subject to the recommendations (if any) of the City Engineer, City Attorney and those of the South <br />Washington Watershed found to be reasonable and practical by the City Engineer. <br />Staff suggests that the noted discrepancies from City Code requirements on the site plan can be <br />easily corrected by the applicant without a major impact on the plans. Therefore we recommend <br />approval of the site plan subject to the following conditions: <br />