My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
June 20, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
June 20, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 12:07:05 PM
Creation date
10/1/2019 3:19:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Preparation of applications and supporting documents for governmental grants, loans or <br />advances in connection with the Project; preparation or review of environmental <br />assessments and impact statements; review and evaluation of the effect on the design <br />requirements of the Project of any such statements and documents prepared by others; <br />and assistance in obtaining approvals of authorities having jurisdiction over the <br />anticipated environmental impact of the Project. <br />F. Services resulting from significant changes in extent of the Project or its design <br />including, but not limited to, changes in size, complexity, the OWNER'S schedule, or <br />character of construction or methods of financing; and revising previously accepted <br />studies, reports, design documents or Contract Documents when such revisions are due to <br />causes beyond TKDA'S control. <br />G. Furnishing the services of special consultants for other than the normal civil, structural, <br />mechanical, and electrical engineering and normal architectural design incidental thereto; <br />providing renderings or models for the OWNER'S use; and providing data or services of <br />the types described in General Agreement when the OWNER authorizes TKDA to <br />provide such data or services in lieu of furnishing the same in accordance with the <br />General Agreement. <br />H. Services in connection with change orders provided such change orders are required by <br />causes not solely within the control of TKDA; services after the award of each contract in <br />evaluating substitutions proposed by the Contractor(s); and in making revisions to <br />Drawings and Specifications occasioned thereby, and services resulting from significant <br />delays, changes or price increases occurring as a direct or indirect result of material, <br />equipment or energy shortages. <br />I. Preparing for the OWNER, on request, a set of reproducible record prints of Drawings <br />showing those changes made during the construction process, based on the marked -up <br />prints, drawings and other data furnished by the Contractor(s) to TKDA and which <br />TKDA considers significant. <br />Additional or extended services during construction made necessary by: <br />Contractor's schedule; delays in construction caused by inclement weather, strikes <br />or material shortages or unavailability. <br />2. Significant amount of defective or neglected work of the Contractor, default by <br />the Contractor. <br />Work damaged by fire or other causes during construction. <br />4. Significant substitutes proposed by the Contractor; unreasonable number of <br />claims submitted by the Contractor or others. <br />IM, <br />
The URL can be used to link to this page
Your browser does not support the video tag.