My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-16-92 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1992
>
06-16-92 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 3:36:33 PM
Creation date
10/2/2019 8:22:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAKE ELMO CITY COUNCIL MEETING JUNE 16, 1992 9 <br />8• CITY ATTORNEY'S REPORT: <br />A. Derrick Lots <br />Attorney Filla reported that he, Larry Bohrer, Mr. Derrick <br />and his attorney and consulting engineer, were present at <br />the site and heard the reason for the activity observed. <br />When the representatives were monitoring the site to <br />determine water levels, of the <br />they concluded that part <br />reason the water elevation was not of was because of <br />the nature of soil conditions between the bottom of the <br />mound and the curtain drain was impervious and they might <br />improve the statistics by replacing that soil. As Larry Bohrer gets the data from Barr Engineerisoon as <br />the nature of this replacement soil isng to see what <br />opinion to the City , he will render an <br />test as to whether or not we can accept the <br />receivessatisfying the city code. As soon as he <br />opinion. results as Bohrer satisfying <br />response, Filla will give the city his <br />B. Arabian Hills <br />The First State Bank of Spring Lake Park called the city <br />administrator and indicated they would be willing to renew <br />the letter of credit for Northern Lakes Diversified, Arabian <br />Hills, for six months. Filla explained there is about <br />$15,000 worth of improvements left to be going to get building Permits <br />done. They are not <br />done. ts until the improvement work is <br />Filla suggested a motion authorizing the mayor to sign the <br />letter that called the letter of credit and instruct the <br />city administrator to hold onto to this until Friday. if <br />new letter of credit was here, this letter would not be <br />sent. If the new letter of credit was not here, the letter <br />would be sent. This means the bank would give us the money <br />and we can deal with the developer. <br />M/S/P Mottaz/Dick Johnson - to authorize the Mayor to sign <br />the letter to First State Bank of Spring Lake Park and <br />instruct the city administrator to .hold the letter until <br />Friday. If a new letter of credit arrives, this letter <br />would not be sent, but if the letter does letter will be sent. (Motinot arrive, the <br />on carried 3-1: Williams: It has <br />been a year to get these improvements done, and he-s not <br />interested in letting this drag on any longer. We should <br />call the letter of credit and get the work done). <br />
The URL can be used to link to this page
Your browser does not support the video tag.