My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-02-94 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1994
>
08-02-94 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:51:18 PM
Creation date
10/2/2019 8:28:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� .JUL-29-1994 13:24 TKDA <br />612 292 0033 P.06107 <br />Honorable Mayor and City Council <br />November 12, 1993 <br />Page 3 <br />There are some areas of the plan which do not relate to policies, are not controversial, and could <br />begin now. The two areas of the plan which could begun now are portions of the surface water <br />resource data inventory and identification of problem areas. Specifically, Task E.3.e) and f) <br />which is the mapping of existing pipes, culverts, stonmwater ponds, outlet control structures, and <br />the tabulation of flood levels and discharges from these structures, could be completed now. <br />This 'mapping would also benefit the Maintenance Department in their work of locating and <br />maintaining these existing structures. The second task that could be completed now is Task 0 <br />which is the identification of problem areas. The estimated cost to analyze the problem areas is <br />directly dependent on the number of problem areas to be studied, <br />The estimated cost for the stonnwater system inventory and mapphng is $13,600,00 and is <br />recommended to be Phase 1 of the local surface water management platunhng, Also included in <br />Phase 1 is the identification of existing problem areas that warrant study. This will involve some <br />workshops with the Council and/orpublic meeti,ogs. Once the areas to be studied are Identified, <br />a cost estimate can be prepared. The actual study of these areas would be considered Phase 2. <br />The estimated cost to identify those problem areas which warrant further study is $1,400.00, <br />The total estimated cost for Phase 1 work is $15,000.00, <br />Sincerely, <br />X�—? /jo s/� <br />Larry 1), Bohrer, P.E. <br />LDB/mha <br />
The URL can be used to link to this page
Your browser does not support the video tag.