My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-02-94 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1994
>
08-02-94 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:51:18 PM
Creation date
10/2/2019 8:28:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2.3 Echo Lake Water Management Plan <br />4.2.3.1 Location and General Description <br />Echo Lake is a small, shallow lake (DNR #82-135W) located in Subwatershed ECO1, <br />approximately 1/2 mile northwest of Long Lake, in the City of Mahtomedi. It has a surface <br />area of about 30 acres and is situated along the east boundary of the 916 Vocational -Technical <br />School property. The DNR's ordinary high water elevation (OHW) for Echo Lake is 996.3. The <br />Echo Lake tributary area is 190 acres, which is comprised of Subwatersheds ECQ1 through <br />EC06. Figure 2-3 shows the tributary area. Runoff from a portion of the Vocational -Technical <br />Institute buildings and parking lots passes through a small detention/sedimentation pond <br />before reaching Echo Lake. Residential development is occurring in the south and east portions <br />of the tributary area. The remainder of the watershed is expected to develop in the next 5 <br />years. <br />4.2.3.2 Drainav-,e _Patterns and Stormwater issues <br />The existing outlet from Echo Lake is a deformed corrugated metal pipe approximately <br />15 inches in diameter, with an upstream invert at Elevation 995.5. The pipe is located on Lot 5, <br />Block 2 of Echo Lake 2nd Addition, under old Echo Lake Avenue, on the south side of the <br />wetland which comprises the southwest side of the lake. Prior to construction of the Echo Lake <br />Addition development, the surface overflow from Echo Lake was at Elevation 996.6. As a <br />result of the development, the emergency overflow was relocated to a point near the outlet pipe <br />and raised to Elevation 997.8. Water discharged from the Echo Lake outlet makes its way south <br />and east through a series of wetlands to Weber Pond. <br />There are three ponding areas in the Echo Lake Addition development which discharge <br />j to Echo Lake but are also designed to be part of the Echo Lake flood plain. Water from Echo <br />Lake will overflow to these ponding areas only when the Echo Lake water level is equal to or <br />greater than its outlet elevation (995.5). <br />Prior to raising the surface overflow elevation, the calculated 100-year (full development) <br />flood level of Echo Lake was Elevation 996.8, which includes the flood plain/wetland area east <br />of the lake. Under these conditions, the 100-year flood elevation of Long Lake increases 0.5 foot <br />above the elevation stated in the previous VBWD plan (from 943.2 to 943.7). The flood <br />elevation in the previous VBWD plan was based on restricted outlets from both Long Lake and <br />Echo Lake. As a result, additional storage is needed on Echo Lake (and Weber Pond) to <br />prevent this increase in the Long Lake flood elevation. This was anticipated in VBWD's <br />previous plan, which stated: <br />"A 100-year flood level" (Elevation 998) "3 feet above the normal level is proposed for <br />Echo Lake. The increase in storage volume is proposed to be done by the City or <br />developer at the time when development of this subwatershed is occurring. Storage in <br />the uneven terrain northwest of the lake should be preserved during development and <br />the lake itself should have maximum utilization of its storage volume during <br />development to keep outflow rates very low." <br />However, the previous VBWD plan did not include the Echo Lake outlet improvements <br />or easement acquisition as part of the Capital Improvement Program. As a result, the existing <br />outlet remains in place and easements still need to be acquired for the proposed higher flood <br />level on Echo Lake. In addition, VBWD must obtain a DNR permit to construct a new outlet <br />from Echo Lake. <br />23\82\045\SEC4.RPT\KMH 7 DRAFT: June 23, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.