Laserfiche WebLink
<br /> \ <br /> . 5. A topographic map of the development area with contour <br /> information at two (2 ) foot intervals or spot elevations at <br /> two hundred (200) foot intervals and at a horizontal scale of <br /> one (1) inch to one hundred (100) feet or larger. <br /> 6. A detailed site plan of the proposal showing proposed <br /> drainage, grading, and landscaping. <br /> 7. A site design map showing the location of existing and future <br /> man-made features within the site and to a distance of five <br /> hundred (500) feet surrounding the site or to the wetland <br /> drainage district boundary, whichever is shorter. <br /> 8. Information on existing drainage and vegetation of all lands <br /> within the site and to a distance of five hundred (500) feet <br /> surrounding the site or to the wetland drainage district <br /> boundary, whichever is shorter. <br /> 9. The time period for commencement and completion of the <br /> development, including time for staging of development, if <br /> applicable. <br /> 10. Design specification and plan for all sediment and erosion <br /> control measures as well as all grading and drainage <br /> . appurtenances and practices. <br /> II. Enaineer ina data related to computations of existina and <br /> proposed hydroloay, water auality, hydraulics, and soil loss. <br /> 12. Such additional information as necessary to evaluate the <br /> permit application. <br /> C. IR t.ho saso of a minor Qo'.rolopmont. or ohanljo aRe/or Qovolopmont. <br /> invol~ing a singlo family dot.aohoe or siRljlo nt.t.nohod rosieoRoo, <br /> t.ho a~plioaRt. may bo oltomptod from st.riot. oOHlllliaRoo t.o oort.ain <br /> ro~iromoRt.s of t.his oreinaRoo, YpOR appro7al by t.ho Cit.y. <br /> Subdivision 5. Time of Permit - Extensions and Renewals. <br /> A permittee shall begin the work authorized by the permit within ninety <br /> (90) days from the date of issuance of the permit unless otherwise--a <br /> eiffereRt. dat.e frOHl t.he o9HlHlenoemoa:t of \lor]t is set forth in the permit. The <br /> permittee shall complete the work authorized by the permit within the time <br /> limit specified on the permit, which shall in no event exceed more than <br /> twelve (12) months from the date of issuance unless such time limit is <br /> extended by the City COYRoil. The permittee shall notify the City at least <br /> . 2362161/WZ02.WP/ABM 14 <br />