My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Council_Minutes_1987_04_27
MoundsView
>
Commissions
>
City Council
>
Minutes
>
1980-1989
>
1987
>
Council_Minutes_1987_04_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 9:55:23 AM
Creation date
2/7/2011 2:28:50 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
4/27/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council April 27, 1987 <br />Regular Meeting Page Four <br />Mayor Linke asked specifically what work would be done <br />by whichever firm was awarded the project. <br />Clerk /Administrator Pauley stated the primary work <br />would be in preparing blueprints, plans and specs and <br />bid documents. <br />Mayor Linke stated Staff has laid out what they are <br />looking for, and he feels Staff will be involved, no <br />matter who is chosen. He acknowledged SEH has done <br />work for the City in the past, but this is a different <br />type of work. <br />Clerk /Administrator Pauley stated he would hope that <br />whatever firm the City goes with would familiarize <br />themselves with the City's system. He explained a new <br />firm would need to spend more time doing that, and SEH <br />has worked on it and is familiar with the City's <br />system. He added they are currently using old style <br />equipment in the water department, and will some day <br />be installing new computerized equipment, and when <br />that is done, many things will have to be relocated, <br />and SEH would be able to take that into consideration <br />in their work for the City. <br />Mayor Linke asked what they would have to do with <br />architectual services. <br />Clerk /Administrator Pauley replied the City is not <br />experts in that field, and they have made drawings <br />based on minimal skill levels, and they need a <br />professional to come through and finish it up, and <br />one who must be able to look at it critically and <br />evaluate it and make recommendations. <br />Councilmember Hankner stated that based on past <br />experience, using a new firm has often cost more in <br />the long run. She stated she would be very comfortable <br />going with SEH, as they are very familiar with the <br />operation and Staff, and there is a good sense of <br />trust with SEH. She added she does not feel the City <br />can afford to gamble on using someone new, when the <br />cost difference is $1,900, and a good chance that SEH <br />can save them that amount in the long run. <br />Motion /Second: Hankner /Blanchard to approve the award <br />for the architectual /engineering services for the <br />public works garage to SEH in the amount not to exceed <br />$13,800. <br />5 ayes <br />0 nays Motion Carried <br />
The URL can be used to link to this page
Your browser does not support the video tag.