My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Council_Minutes_1988_10_24
MoundsView
>
Commissions
>
City Council
>
Minutes
>
1980-1989
>
1988
>
Council_Minutes_1988_10_24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 9:55:39 AM
Creation date
2/7/2011 2:29:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
10/24/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ai the next agenda session, and have Lt. Brick there <br />to make a Staff report and answer questions. <br />Mounds View City Council <br />Regular Meeting <br />Mayor Linke advised the public hearing scheduled <br />for 7 :05 PM had been cancelled due to improper <br />notice. <br />Clerk /Administrator Pauley stated Staff would <br />recommend an informational hearing be held at this <br />time, and the public hearing rescheduled to 7:05 PM <br />on November 14, as well as a public hearing for <br />7:10 PM on November 14, to consider the PUD Concept_Plan_ <br />Motion /Second: Hankner /Blanchard to reschedule <br />the Wetland Alteration Permit, Wetland I -24 public <br />hearing to November 14 at 7:05 PM, and schedule a <br />public hearing for the PUD Concept Plan at 7:10 PM on <br />November 14. <br />5 ayes 0 nays <br />Phillip Seipp, president of SYSCO /Continental, <br />explained they have over 220 employees in their <br />company, and they are very proud of their low turn- <br />over rate, and they also attribute the success of <br />their company to their employees. <br />Mr. Seipp explained the site plan has evolved through <br />many discussions with City Staff and input from the <br />residents and the Planning Commission. He added they <br />are willing to address all the issues presented. <br />Scott Kinkaid, of Ryan Construction, reviewed the <br />site plan and the changes made since the last presen- <br />tation. <br />Dick Koppie, of Westwood. Professional Building <br />viewed the site plan for grading, drainage, landscap- <br />ing and traffic flow. He explained they have been <br />requested to align their roadway with existing Xylite <br />Street, due to anticipated traffic flow, and that, <br />coupled with the location of the Williams Pipeline on <br />the property and constraints in building near that, <br />resultsin the encroachment on the wetland. He added <br />they are working with the Rice Creek Watershed <br />District, Department of Natural Resources, Army Corps <br />of Engineers, and City of Mounds View, in meeting the <br />requirements of all the governing bodies. <br />6. <br />Ron Peterson, a wildlife biologist, reviewed the <br />wetland mitigation package that has been developed, <br />and he reviewed the wetland boundaries and how they <br />were arrived at. He also presented a drawing of how <br />the wetlands would be after development. Mr. Peterson <br />reviewed the issues the ordinance requires to be addressed <br />and how the had approached them. <br />October 24, 1988 <br />Page Two <br />Informational <br />Hearing: <br />Wetland Alter- <br />ation Permit <br />Wetland I -24 <br />Motion Carried <br />
The URL can be used to link to this page
Your browser does not support the video tag.