Laserfiche WebLink
Allowed Uses <br />The PUD concept plan includes the following uses: <br />Parcel 1 Gas station/convenience 6,500 sq. ft. max <br />market <br />Car wash 3,000 sq. ft. max <br />RV Dump Station <br />Parcel 2 Office building 25,000 sq. ft. max <br />Parcel 3 Office building 5,000 sq. ft. max <br />Parcel 4 Senior housing 115,800 sq. ft. max <br />PUD Site Data <br />Gas station/convenience market/car wash <br />Office building <br />Office building <br />Senior housing <br />Total <br />(Total Site Area = 13.0 ac) <br />Impervious Pervious <br />1.33 ac 0.30 ac <br />1.43 ac 0.69 ac <br />0.28 ac 0.83 ac <br />1.31 ac 6.86 ac* <br />4.22 ac 8.68 ac <br />(32.7 %) (67.3 %) <br />*This total includes the wetland and St. Paul Waterworks ROW <br />Dimensional Requirements <br />Setbacks - Buildings <br />Highway 10 & Silver Lake Road 30 feee <br />Private drive 15 feet <br />Interior lot lines 0 feet(2) <br />Wetland 100 feet(3) <br />St. Paul Waterworks 30 feet <br />Setbacks - Parking Areas <br />Highway 10 10 feet(6) <br />Silver Lake Road <br />Parcel 1 20 feet <br />Parcel 4 27 feet <br />Private drive 10 feet(4) <br />Interior lot Ines 0 feet° <br />Wetland 100 feet(3) <br />St. Paul Waterworks 30 feet <br />Building Heights(4) <br />7. <br />