My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1997
>
1997 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 4:33:48 AM
Creation date
2/27/2012 3:06:30 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Silverview Estates Dev. Co. <br />Preliminary Plst &. Development Review <br />Planning Cases 501 a97 and 502-9i <br />August 20, 1997 <br />Page 3 <br />concept plan stage. Therefor�, regardless of �he number of square feet, the building mass ��� <br />gener�l design have noi changed. Addiiionally, the senior housing stnaciure reflected in both <br />the concepi plan and the development stage plan are respective af the esiabiished setbacks. <br />As such, the necessary amendment to the F'iJD reflects a modification to the square footage <br />number to reflec� the building footprint, <br />� Information needs io be submitted to assist in th� determination of pervious versus imperviou� <br />surfaces for each oi the siies within the PUD. <br />.gpplicarat's ��po�ase: I may hcave those exact figures by the Augzrst 20r" nteeting. The data <br />will be o» Phe revised site plan for September 3rd Again, it is our intent to abide by the <br />concliiions of the PUD documerat. <br />AIl plan sheeis that de�ici buiIding elevations need to be modified to include finished buiiiding <br />height. <br />Color and materials boards and arclutecturai renderir�gs are required as part of the development <br />stage plan srabrnittal, <br />Applacr�azt's l�espo�e: Colored elevations of all buildings will be presenteci at the Planning <br />Commission rrreeiirrg. The data tividl be on the revised siPe plcan fa� September 3'd Agaan, <br />it is our intent to abide by the conditrons of the PUD doczojvrent. Building materials wrll be <br />presented Po the Plan�rirrg Commrssion on August 201�' as well as architectu�al renderings of <br />each building. It is our intent to coordinate building materials cared color thraughout the <br />PUD. <br />� The site plans for the iwo-story office building, the one-story offic� building and the senior <br />housing stnictur� do not indicate a location or constructian type for trash ar�d recycling <br />enclosures. <br />Applieant'� Ilespn�se: The site plan shows a trcash enelosure adjcaeent to the C-store. All <br />oiher bualdings hcrve been designed to handle trcash inside. <br />•'I'he si�e plan sheet 1 of 1 indicates a 10-foot setback for the parking area along Silver Lake Road <br />in front of the senior housing building. The zninimum seiback required in ihe PTJ�3 is 30 feet. <br />.4pplieac�P9s I�esponse: This was ca�a over°sight. We have ample parking to �rcrke the <br />appropriate adjustment to provfde a 30 foot setback alang Silve�° Lake Road. <br />The detailed landscaping plan that is required far submittal at tl7is stage requires that the ptan <br />sl�ow species, numbers and siz�s of ail pIant materiai. The "preiiminary planging pIan" thai has <br />been submiited does t�ot indicate siz�s, does nat reco�nize incorporation of existing trees that will - <br />b� preserved an site, and does not specify iocation for plant species. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.