Laserfiche WebLink
h4r Gr eg Lee File 43.5-05-000 <br />Mounds Yieiv, 1viN OrloGer S. ?005 <br />lvledtronics -Proposal for Utility Extension Report Page 4 <br />Compensation <br />Compensation for our services, including all items and deliverables as outlined in above Scope <br />of Services would be as follows: <br />• Sanitary Sewer System: Lump Sum of $ 9,500.00 <br />• Water Distribution System: Lump Sum of $10,500.00 <br />• Preliminary Survey: Hourly rate estimated total $ 2,000.00 <br />Totai Compensation: $22,OOO.OU <br />As part of our investigation, we will communicate regularly and as necessary with City Staff to <br />obtain infornation, discuss project questions, and discuss progress. However, it should be noted <br />that the fee stated above does not include any organized meetings with City Staff beyond the <br />project kickoff meeting. Any additional meetings, such as intern~ediate update meetings or <br />meetings to present the completed report, if desired by the City or developer, would generate a <br />request for compensation on an hourly basis, in accordance with the rates and terms stated in our <br />on-going contract for services with the City. <br />It should be noted that in the event this project were to continue development, and the City were <br />to direct us to prepare detailed construction plans and specifications, those would be prepared <br />under our existing contract with the City. As stated in our contract, the design fee for the plans <br />and specifications is determined as a percentage of the construction cost of the project. At the <br />time the design fee for the plans is collected, an appropriate credit for the feasibility report that <br />• preceded the plans as part of the project is given to the City. <br />The credit for tl~e report fee is determined based on the portion of the study that proceeds from <br />feasibility report stage to construction plan stage only. No credit is given for those efforts to <br />investigate design alternatives as part of the report, or for' those portions of the selected <br />alternative that are included in the report but not included in the final construction plans. In <br />addition, no credit is given Far preliminary survey activities performed as part of the design. <br />This information is stated here so that the City and developer are aware that, although a <br />significant portion of the report cost stated above would be able to be credited back if the project <br />were to proceed to final construction plans, the entire cost of the report would not. <br />Potential Additional Sanitary Sewer Analysis <br />It should be noted the capacity analysis per'forn~ed under the Scope of Services may find the <br />existing City system, specifically the existing 18-inch diameter- main on laclcson Street, is not <br />able to accommodate the anticipated flow increase from the development. In that case, <br />additional analysis and investigation could be performed to determine the options available to the <br />City to accommodate the flow. <br />Potential options could include a new City sewer main parallel to the existing 18-inch main, <br />replacement of the existing 18-inch main with an upgraded, larger diameter main, or some <br />combination of these two. Options could also include investigating a new, separate connection <br />to the existing 50-inch diameter MCES main for a new parallel line, use of the existing City <br />connection to the 60-inch MCES line, or the possibility of a new City connection to the existing <br />30-inch diameter MCES on the south side of Highway 10. Options would be dependent on the <br />allowances of existing agreements between the City and MCES. <br />