My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6652
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
06500 - 06999 (2005-2007)
>
Resolution 6652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:11:01 AM
Creation date
4/6/2007 10:42:24 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
htr Creg Lee File 435-OS-000 <br />Nlarrnds Viei». NIN OctoGer- 5, ?005 <br />Mledborrics - Pr oposn! for' Utility Estensiar Report Pnge 5 <br />Such additional investigation and analysis would be beyond the scope of the work stated above <br />in the Scope of Services. If this situation were to occur, we would discuss the findings of the <br />capacity analysis performed under the original Scope of Services with the City and would not <br />proceed with the additional analysis without autltorization from the City. <br />• Fee for' additional sanitary sewer analysis, if required: $2,000.00 <br />Schednle <br />It is our understanding that if this development proceeds, the City wilt want to begin construction <br />of these utility extensions nn approximately in mid to late summer of 2006. In order to allow the <br />maximum time possible for design of final construction plans, review, concurrence, agency <br />approvals, etc,, it is our recommendation that this feasibility study be considered by the City <br />Council at the earliest possible opportunity for the purpose of ordering the study. Once the study <br />is ordered, we anticipate it will take six to eight weeks to complete, not including potential <br />additional analysis. <br />City Responsibilities <br />This quote for services has been prepared using the assumptions that the City will have the <br />following responsibilities inregard to the project: <br />• Malce existing utility record pla~is available to Bonestroo. Bonestroo would pick up the <br />plans, copy or reproduce required information from them as necessary, and return the <br />• original plans to the City as part of the project services. <br />• Assist Bonestroo in accessing the existing utility features, including but not limited <br />manholes, valves, and hydrants. <br />• Assist Bonestroo with operation of the water system to perform the hydrant tests, <br />• Coordinate with tl~e City of Blaine to obtain information regarding their water system, <br />including hydrant flow data. <br />• Determine financial responsibilities for the improvements. $onestroo would provide cost <br />estimate information in breakdowns !configurations as necessary to assist City. <br />Developer Responsibilities <br />This quote for services leas been prepared using the assumptions that the developer will have the <br />following responsibilities inregard to the project: <br />• Provide soil boring information on their site for use in determining impact on potential <br />utility installation. Specifically near the wetland in the southeast portion of the site. <br />• Provide inforn~ation on anticipated daily domestic water demand. <br />• Provide operating requirements for fire suppression system in the buildings. <br />• Provide anticipated sanitary sewer discharge rates from the site (if known) or other <br />information necessary to determine such rates. <br />• Provide other information on the proposed use of tl~e site as requested in order for <br />Bonestroo to perform the analysis as accurately as possible. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.