My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/12/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/12/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:40 PM
Creation date
2/27/2018 2:31:05 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/11/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
12/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(3 <br />December 1, 2017 <br />Don Peterson <br />Page 2 of 6 <br />Reference: Mounds View Comprehensive Plan <br />A. Project Understanding <br />The Local Surface Water Supply Plan, Sewer Plan, and Water Supply Plan need to be updated <br />simultaneous to the Comp Plan. These will be prepared as separate documents and then <br />included within the Comprehensive Plan under the Water chapter. The scopes for these three <br />technical plans are included in this work plan. <br />B. Scope of Services <br />a. Local Surface Water Management Plan <br />Stantec will complete an update to the City's Surface Water Management Plan (SWMP). The tasks <br />below outline the scope of services for the work. The estimated cost to complete this work is <br />$25,000. <br />The plan will focus on meeting the latest regulatory minimum requirements as required by the state <br />(MN Rules 8410), Metropolitan Council, and the Rice Creek Watershed District. <br />1. PROJECT INITIATION/MANAGEMENT <br />a. Hold a kickoff meeting with City staff to discuss the City's needs, refine study goals and <br />expectations, and confirm the work plan for the project. <br />b. Develop a schedule of progress meetings. At this point, we have budgeted for only the <br />kickoff meeting. If progress meetings are desired, they can be done at an additional <br />cost to the project. <br />2. DATA COLLECTION <br />a. At the kickoff meeting, discuss data needed for the study. This information could <br />include (electronic files preferred): <br />i. System mapping, topography, and aerial photography <br />ii. Physical system data (storm sewer base mapping, including pipe sizes and <br />invert elevations; pond grading plans; emergency overflow locations and <br />elevations; water quality data) <br />iii. Impaired waters listings and TMDL information <br />iv. MS4 program information <br />v. Land use <br />vi. Capital improvement plan <br />vii. Street reconstruction program <br />viii. Water resource related agreements <br />Design with community in mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.