My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/12/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/12/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:40 PM
Creation date
2/27/2018 2:31:05 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/11/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
12/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
December 1, 2017 <br />Don Peterson <br />Page 4 of 6 <br />Reference: Mounds View Comprehensive Plan <br />Present the results of the report at a City Council or other public meeting, at the City's direction. <br />b. Comprehensive Sewer Plan <br />Stantec will complete an update to the City's Comprehensive Sewer Plan (CSP). The tasks below <br />outline the scope of services for the work. The estimated cost to complete this work is $16,000. <br />The plan will focus on meeting the latest regulatory minimum requirements as required by <br />Metropolitan Council. <br />1. PROJECT INITIATION/MANAGEMENT <br />a. Hold a kickoff meeting with City staff to discuss the City's needs, refine study goals and <br />expectations, and confirm the work plan for the project. <br />b. Schedule a progress meeting. At this point, we have budgeted for only the kickoff <br />meeting. If progress meetings are desired, they can be done at an additional cost to <br />the project. <br />2. DATA COLLECTION <br />a. At the kickoff meeting, discuss data needed for the study. This information could <br />include (electronic files preferred): <br />i. System mapping, topography, and aerial photography <br />ii. Physical system data (pipe lengths, sizes, and invert elevations; lift station and <br />forcemain data) <br />iii. 1/1 data, ordinances and policies, and implementation activities <br />iv. Water use and connection data <br />v. Latest land use, from the Comprehensive Plan update <br />vi. Capital improvement plan that includes a proposed time schedule for the <br />construction of new trunk sewers <br />vii. Past studies and reports <br />viii. Known problem areas <br />b. Follow up with City staff to obtain the available information. <br />3. INFILTRATION AND INFLOW <br />a. Based on Metropolitan Council requirements, review the 1/1 section of the plan and <br />update the section to define the City's goals, policies, and strategies for preventing <br />and reducing excessive 1/1 in the local sewer system. We assume that a summary of 1/1 <br />data, monitoring, reports, ordinances and policies, recent implementation activities, <br />Design with community In mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.