My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:24 PM
Creation date
6/13/2018 4:16:59 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
4/11/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 07B <br />Meeting Date: April 11, 2016 <br />Type of Business: CB <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Public Works Director/City Engineer <br />Item Title/Subject: Resolution 8540, Approve County Road I Concrete Rehabilitation <br />Project Cost Share Agreement with Ramsey County <br /> <br />Background: <br />As part of Ramsey County’s Transportation Improvement Plan, the county has scheduled a <br />concrete rehabilitation project on County Road I between County State Aid Highway 10 and I- <br />35W. This item was tabled at the March 28, 2016 Council meeting in order to allow staff time <br />to provide additional information. <br /> <br />Discussion: <br />This project includes concrete pavement restoration, catch basin repair, pedestrian curb ramp <br />replacement and the replacement of the temporary traffic signal at County Road I and Quincy <br />Street. In addition, Ramsey County will convert County Road I from four traffic lanes to three. <br />This will improve safety for motorists making left turns; provide shoulders for bicycle and <br />service vehicles and create safer crossings for pedestrians. <br /> <br />Work is anticipated to begin in the summer or fall of 2016 and will take approximately three <br />(3) weeks to complete. During the construction, County Road I will remain open to traffic; <br />however, there may be short-term lane closures or detours. Temporary, alternative access <br />plans for driveways will be established with property owners if necessary as the concrete <br />cures. <br /> <br />The signal replacement at Quincy Street will remove the cable supported signals and replace <br />them with a standard signal/overhead cross arm configuration. Two of the four signal legs <br />associated with this intersection are part of Mounds View’s street network, thus the city is <br />responsible for the purchase and installation of half of the signals at this intersection. Quincy <br />Street is part of the Municipal State Aid Street system and this work is eligible for <br />reimbursement through state aid. The initial signal replacement cost including engineering <br />and construction administration is estimated at $175,199.60. <br /> <br />In addition to the signal replacement, there are several panels that will be replaced due to a <br />water service repair that was performed previously. The patch is currently a temporary <br />bituminous patch that the county will replace with the project. The initial estimated cost of <br />this patch is $9,330.40. <br /> <br />The total initial estimated cost for the City of Mounds View is $184,529.00. Included in this <br />estimate are design and construction engineering fees related to this work. It should be <br />noted that the actual cost to the City will be based on actual bid amounts. Prior to award of
The URL can be used to link to this page
Your browser does not support the video tag.