My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/08/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/08/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:40 PM
Creation date
6/18/2018 6:36:26 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/24/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
8/24/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SYSCO Foods Expansion <br /> Planning Case 532-98 <br /> August 20, 1998 <br /> Page 2 <br /> Setbacks: <br /> The plans provided to staff, date stamped 8/14/98, do not explicitly show setbacks and thus have <br /> been estimated by staff. Because of this, we have requested a confirmation of all setback <br /> distances from the applicant. The current conditions plan show the front setback for the SYSCO <br /> facility to be 30 feet, while the setback for parking lot appears to be zero. It is proposed that the <br /> parking lot expansion will maintain the same zero setback. The existing setback for the access <br /> drive along the east side of the property begins at 50 feet, then narrows to a zero setback, <br /> gradually increasing to 25 feet before ending at approximately 18 feet. The proposal shows the <br /> access drive extending the zero setback for approximately 300 feet. The truck parking at the rear <br /> of the property currently ranges from 15 to 20 feet, which is shown to be decreased by 10 feet. <br /> The new truck parking along the western edge is shown with a 10 foot setback. <br /> Staff is concerned about the reduced and zero setbacks present in the proposed expansion plans. <br /> The City may, however, allow these setbacks in conjunction with the development plan because of <br /> SYSCO's PUD zoning status, which allows for deviations from the City's setback requirements. <br /> It appears from the plans that the zero setback status is a present condition which, by virtue of its <br /> existence, has received City approval in the past. The reduced setback toward the rear of the <br /> property are less of a concern, as this area borders Highway 118 and is shielded from view by the <br /> noise barricades. The reduced setback along the eastern edge of the property is of a concern, not <br /> because of the adjacent property owner, but rather because of the possible environmental impact <br /> to the wetlands. To protect against possible degradation of the wetlands, staff had recommend <br /> that the access drive maintain a minimum ten foot setback along the property's entire eastern <br /> edge. This would have resulted in the drive aisle being narrowed to forty feet in one area unless it <br /> could have been shifted to the west a compensating distance. The applicant has indicated an <br /> unwillingness to make this change. <br /> Elimination of Open Space: <br /> Staff has examined the original PUD documentation, site plans and resolutions in an effort to <br /> determine what development restraints, covenants or restrictions might apply to the present <br /> expansion. With the exception of car dealerships and multiple-family housing, there are no <br /> provisions within the Code that require a development to have a certain amount of greenspace. <br /> The City Code, in Section 1120.02, Subdivision 3, states only that a PUD provide a"sufficient" <br /> amount of open space. The proposal presented by SYSCO utilizes most of the remaining <br /> greenspace on the site, with the balance set aside as future expansion area. The site plans also <br /> show that Lot 1, Block 1, of the SYSCO Addition, the triangular area west of the SYSCO <br /> development, is slated for future parking. <br /> Parking and Access: <br /> There are approximately 362 parking stalls present on the Sysco property which had been <br /> approved for the site with its initial development and expansion in 1995. The current proposal <br /> would bring this total up to 444. Truck parking will also increase by 53 slots, bringing the truck <br /> capacity up to 104 stalls. The access drive servicing the facility is proposed to be widened to 50 <br /> feet, which will better accommodate two-way truck traffic. The access is currently 50 feet wide <br />
The URL can be used to link to this page
Your browser does not support the video tag.