My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1996/06/10
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1996
>
Agenda Packets - 1996/06/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:26 PM
Creation date
6/19/2018 6:59:01 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/10/1996
Supplemental fields
City Council Document Type
City Council Packets
Date
6/10/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.r nr._, JF REQUEST FOR COUNCIL CONSIDERATION Agenda Section 11.F <br /> 96-1756C <br /> STAFF REPORT Report Number: <br /> 1 �' "'3 =' Report Date: 6/4/96 <br /> CITY COUNCIL MEETING DATE <br /> `'' ` June 10, 1996• <br /> Special Order of Bus. <br /> III <br /> .14' Consent Agenda <br /> o�""st•Parmer5 Public Hearings <br /> X Council Business <br /> Item Description: Consideration of Engineering Proposals to Relocated Surface Water Pond <br /> Administrator's Review/Recommendation: C `^1 <br /> -No Comments to supplement this report <br /> -Comments attached. X <br /> Explanation/Summary(attach supplement sheets as necessary) <br /> Summary: <br /> At the June 3, 1996 work session, staff informed Council of the expense and related long term maintenance <br /> issues related to construction of the pedestrian bridge within the surface water pond adjacent to the <br /> Bridgeman's building. The additional expense of reconstructing the pond is estimated to be at least$40,000. <br /> The estimated cost to relocate the pond to City property are approximately $10,000 to 32,500. <br /> Staff has received two quotes for engineering services to move the pond and proceed through the permitting , <br /> process. The quotes accompany this report and the expenses are as follows: <br /> BRW $7,620.00 <br /> SEH $6,900.00 <br /> •Both of these quotes cover the same scope of project. Neither proposal includes design and construction <br /> services, these would be additional, as would the construction of the pond and related work. I <br /> Staff recommends Council award the engineering study to SEH for the amount of$6,900 to relocate the <br /> surface water pond to City property, in conjunction with the pedestrian bridge project. Funds for this <br /> expenditure would be utilized from the Surface Water Management Fund 420-4122-303, Professional <br /> Services. <br /> / /,? -. <br /> Michael Ulrich, Director of Public Works <br /> RECOMMENDATION: • <br /> Council authorize staff to sign the agreement letter with SEH to complete an engineering analysis to relocate <br /> the surface water pond adjacent to Bridgeman's, for the construction of the pedestrian bridge for the amount <br /> of$6,900, to be funded from the Surface Water Management Fund, System Maintenance 420-4122-303, <br /> Professional Services. <br /> III <br />
The URL can be used to link to this page
Your browser does not support the video tag.