Northwest in order to close out this project. <br /> <br />The City has been withholding 5% of the value of completed work, pending completion of the <br />punch list, verification of all the quantities, and providing all closeout documents. The following <br />table provides a summary of the total project cost. <br /> <br /> <br />The construction contract is based on line item bids and as the Project progresses the quantities <br />could be over or under the estimate. The quantity adjustments resulted in a reduction of <br />$54,000 to the contract. In the case of this Project, there were several line items that were <br />under estimated, which resulted in extra cost. Some of those items include: <br />• Common excavation <br />• Main Line Dewatering <br />• Class 5 aggregate base <br />• Inline CIPP, 15” RCP <br />In addition some quantities were over estimated resulting in a cost savings. Some of those <br />items include: <br />• Service Line Dewatering <br />• Select Granular Borrow <br />• 4” Concrete Walk <br />• Sodding <br /> <br />There were four change orders to the contract. Change order number 1 was for installing a <br />temporary bituminous walk at the corner of Groveland and Arden for the winter. Change order <br />number 2 was for various water main repairs that occurred during the project. Change order <br />number 3 was for additional sanitary sewer replacement. Change order number 4 was for <br />additional work required in repair the lift station. <br /> <br />Final Difference <br />Design & Inspection <br /> Design 177,300.00$ 177,382.60$ 82.60$ <br /> Design - Street 133,300.00$ <br /> Design - Lift Station 44,000.00$ <br /> Bidding 6,000.00$ 5,450.00$ (550.00)$ <br /> Construction 236,000.00$ 261,719.47$ 25,719.47$ <br /> Construction - Street 210,000.00$ <br /> Construction - Lift Station 26,000.00$ <br /> Geotechnical Testing 53,783.00$ 38,954.00$ (14,829.00)$ <br /> MSA Testing 1,000.00$ 2,230.25$ 1,230.25$ <br />Subtotal Design 474,083.00$ 485,736.32$ 11,653.32$ <br />Construction <br /> Construction 3,186,557.69$ 3,132,718.42$ (53,839.27)$ <br /> Contingency (3%)95,596.00$ (95,596.00)$ <br /> Change Order 1 - Temp. Bit Walk 18,378.76$ 18,378.76$ <br /> Change Order 2 - Water Main Repairs 18,012.48$ 18,012.48$ <br /> Change Order 3 - Sanitary Replacement 36,731.15$ 36,731.15$ <br /> Change Order 4 - Additional Lift Station Work 25,230.98$ 25,230.98$ <br />Subtotal Construction 3,282,153.69$ 3,231,071.79$ (51,081.90)$ <br />TOTAL PROJECT COST 3,756,236.69$ 3,716,808.11$ (39,428.58)$ <br />TOTAL PROJECT COST <br />Bid/Estimate