Laserfiche WebLink
Ft7 w ... ..rf <br />= A. • . • .r. r w i } � <br />FOR t- - , ' AVENUE IN AREA G OF THE STREETANDUTILITY IMPROVEMENT <br />R - <br />WHEREAS, the City Council adopted Resolution 7176 on October 22, 2007 establishing <br />the Street and Utility Improvement Program (Program), which includes nine Street and Utility <br />Improvement Projects identified as Areas A through I; and <br />WHEREAS, Ardan Avenue is a non-standard street in Area G of the Program due to its <br />Municipal State Aid status and has proposed pedestrian/bicycle accommodations in accordance <br />with the 2008 Comprehensive Plan; and <br />WHEREAS, City staff developed design recommendations for Ardan Avenue and <br />reviewed these recommendations with the Streets and Utilities Committee and adjacent property <br />owners in Area G and H on October 21, 2013, including soliciting resident feedback; and <br />WHEREAS, Engineering staff and the Street and Utilities Committee recommended that <br />Ardan Avenue in Area G be reconstructed to 32 -feet wide with two 11 -foot traffic lanes, one 2 - <br />foot reaction zone/shoulder adjacent to the westbound traffic lane (north side), and one 8 -foot <br />wide parallel parking outside the eastbound traffic lane (south side), which the City Council <br />approved on October 28, 2013 (Res. 8168); and <br />WHEREAS, in response to Ardan Avenue property owner inquiries and staff re- <br />evaluation, Engineering staff recommends the addition of a 6 -foot wide concrete sidewalk in the <br />north boulevard adjacent to the curb to the adopted non-standard street design for Ardan <br />Avenue. <br />NOW, THEREFORE, BE IT RESOLVE® by the City Council of the City of Mounds View, <br />Ramsey County, Minnesota as follows: <br />1. The addition of a 6 -foot wide concrete sidewalk located immediately behind the north curb to <br />the non-standard street design of Ardan Avenue between Red Oak Drive and Long Lake <br />Road is hereby approved and will be reconstructed as a 32 -foot wide street, measured at the <br />face of curb, with two 11 -foot traffic lanes, one 8 -foot wide parallel parking on the south <br />(eastbound) side, a 2 -foot reaction zone/shoulder adjacent to the north (westbound) side, <br />and a 6 -foot wide concrete sidewalk immediately behind the north curb. <br />Stantec is authorized to revise the bidding documents for the 2014 Street and Utility <br />Improvement Project — Area G to include the above said sidewalk addition to Ardan Avenue <br />and issue addendums to plan holders. <br />Adopted this 24th day of February, 2014. <br />Joe Flaherty, Mayor <br />ATTEST: <br />James Ericson, City Administrator <br />(SEAL) <br />