My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-2011 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
05-09-2011 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:53 PM
Creation date
6/26/2018 5:47:19 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/9/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Res. 7770 Authorizing TKDA to Perform Design Services & Prepare Plans for Lambert Park Building <br />Page 2 <br />considered to enhance the appeal for renting. However, none of these possible tweaks will <br />change the “bricks and mortar” or interior layout of the Groveland plans. If these changes did, <br />then the consultant fee would be more due to the increased design effort and redoing of <br />calculations. <br /> <br />The following is a general scope of services that TKDA will provide: <br /> <br />• Meet with the City to review the Project scope and receive input for minor revisions envisioned <br />to the Groveland Park shelter plans that will be incorporated into the proposed Lambert Park <br />shelter. <br />• Prepare proposed building plan layout. <br />• Meet with the City to review layouts. <br />• Prepare final plan layouts incorporating review comments. <br />• Prepare construction drawings and specifications manual (Contract Documents). <br />• Send application to Minnesota Department of Labor for Plumbing Review. <br />• Provide the City with one electronic copy and three hard copy sets of the Contract Documents <br />for use in obtaining bids for the construction. <br /> <br />Construction is estimated to be upwards of $300,000 and a detailed construction estimate will <br />be prepared by TKDA as part of their services. A public bid is required since the cost will <br />exceed $100,000. Bidding is anticipated to occur in June with construction expected to start <br />sometime in July. A three-month construction schedule is expected, but weather and many <br />other factors can influence this. The main deadline is to have the building complete by the <br />beginning of December to use with ice-skating and hockey activities. <br /> <br />The 2011 Budget includes $260,000 for the Lambert Park building construction. There was also <br />$30,000 budgeted for 2010 for design of the building that was not used. All monies for the <br />project is proposed to be funded by the Park Dedication Fund (251-4470-7050). <br /> <br />Recommendation: <br />Staff recommends that the City Council consider adopting the attached resolution. Doing so will <br />authorize moving ahead with the Lambert Park building demolition and construction for 2011. <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br />Nick DeBar - Public Works Director <br /> <br />Attachments: <br /> Resolution 7780
The URL can be used to link to this page
Your browser does not support the video tag.