My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/04/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/04/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:18 PM
Creation date
6/28/2018 1:40:35 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/7/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
4/7/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1r <br /> City of Mounds View <br /> • Mr. Mike Ulrich <br /> March 28, 1997 <br /> Page 4 <br /> B. Analysis of alterative Energy Management Systems determined as relevant during study: <br /> - Level of sophistication. <br /> - Pros and cons of alternate system compared with existing system. <br /> - Estimated construction cost of each level of Energy Management System. <br /> Wentz Associates,Inc.proposes to provide the described services on an hourly not-to-exceed,basis: <br /> N.T.E. <br /> Fees <br /> City Hall/Administration Building: <br /> Mechanical Systems Evaluation $5033 <br /> Space Environment Evaluation $3600 <br /> Control Systems EMS Evaluation $1850 <br /> • It should be noted that performing the Space Environment Evaluation will :fad; to a better <br /> determination of the sizes of mechanical systems needed. <br /> Engineering services are billed monthly. The above amounts exclude outside costs such as printing, <br /> mileage,postage and messenger service, which will be billed at cost. <br /> We propose to retain the services of Pneumatic Controls Inc. to assist in analyzing the existing <br /> temperature control devices. Their services will be billed as an outside reimbursable expense at cost. <br /> It is estimated that these services will cost approximately $1,000.00. <br /> Construction documents for incorporating recommendations are not included at this time but could <br /> be provided in the future,if and when the scope of work is determined from decisions resulting from <br /> the evaluations. <br /> Thank you for the opportunity to present this proposal. If you have any questions, comments or <br /> revisions, please feel free to call. <br /> Sincere <br /> • Thomas Wentz, P.E. <br /> WENTZ ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.