Laserfiche WebLink
1997 <br />Ground speed control sanders will provide valuable information on deicing chemical <br />application. These controls will ensure accurate application rates and provide necessary <br />documentation of usage. <br />Estimated cost: $ 6,500. Streets Division, Snow and Ice Control Division. <br />SURFACE WATER MANAGEMENT <br />Ditch and retention pond cleaning will be needed in this and future years program. <br />Estimated cost: $ 40,000. Sterfa,SeweE Suface Water System Management. <br />A portable concrete mixer is requested, which will enable staff to repair catch basins and <br />manholes more efficiently. This expenditure will be shared equally 1/3 SWM, 1/3 parks, <br />and 1/3 sewer. <br />Estimated cost: $ 700. Storm Sewer Suraface Water System Management. <br />Backhoe, see streets <br />Estimated cost: $ 23-900 $30,666. StormSower Storm Water System Management. <br />WATER <br />Backhoe, see streets <br />Estimated cost: $ 23,000. UtilityMaintenance. <br />• Additional lab equipment is requested to enable staff' to conduct various tests required by <br />the Safe Water Drinking Water Act. <br />Estimated cost: $ 1,500. Water Production. <br />• A laptop computer will enable staff to more efficiently record valuable test results, <br />drawdowns, and plant maintenance activities. Currently this information is stored in filing <br />cabinets in many different locations, because it is used by many staff members. <br />Computerizing these records will decrease storage space needs, reduce duplication of <br />paper files, and make them readily accessible when requested. <br />Estimated cost: $ 2,200. Water Production. <br />• System maintenance is required on a scheduled basis for all wells and pumps. This <br />procedure provides preventative maintenance verses emergency or repair maintenance on <br />this infrastructure. <br />Estimated cost: $ 15,000. Utility Maintenance. <br />47 <br />