My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-09-1995 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1995
>
10-09-1995 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:27 PM
Creation date
7/2/2018 10:11:50 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/9/1995
Supplemental fields
City Council Document Type
City Council Packets
Date
10/9/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
September 19, 1995 <br /> CLI) RK <br /> ENGINEERING Short Elliott Hendrickson <br /> 3535 Vadnais Center Drive <br /> CORPORATION 200 SEH Center <br /> St. Paul, MN 55110 <br /> Attn: Mr. Rocky J. Keehn <br /> RE: Mounds View, Minnesota <br /> Bridges Technology Park <br /> Master Drainage P/an <br /> SEH No. Center <br /> Clark Comm. No. C95104 <br /> Consulting Engineers <br /> Land Surveyors <br /> Dear Mr. Keehn, <br /> The following information is being forwarded to you per our September 15 <br /> meeting and item number 4 of the letter sent to Mr. Jim Winkels from Mr. <br /> Paul Harrington. <br /> It is our hope that this information will accomplish two goals. <br /> The first goal is to obtain your approval of the revised Lot 3 Grading and <br /> Utility Plans configuration, previously approved by your agency. <br /> The pond has been modified to provide dead storage only (water quality)for <br /> Lot 3 as well as Lot 2. The live storage is proposed to be contained in a <br /> portion of Outlot A. This can be examined by looking at the plans for Lot <br /> Equal <br /> Opportunity 3 construction, as well as the calculation. <br /> Employer <br /> The second goal is to obtain your approval of the Master Drainage Plan into <br /> Outlot A which will provide live storage for Lots 1, 2 and 3. <br /> The Master Drainage Plan for Lots 1, 2, 3 and Outlot A was designed to <br /> provide both water quality and quantity control of storm water runoff. <br /> A. Water Quality <br /> Water quality will be achieved by the use of two ponds. The <br /> Proposed Pond will accommodate storm water runoff from Lots 2 <br /> and 3. The Future Pond is designed to accommodate storm water <br /> runoff from Lot 1. <br /> 2815 Wayzata Blvd. <br /> Minneapolis,MN 55405 Fort Myers Aberdeen Rapid City <br /> (612)374-4740 Florida South Dakota South Dakota <br />
The URL can be used to link to this page
Your browser does not support the video tag.