NO.DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE
<br />1 MOBILIZATION LUMP SUM 1 $12,000.00 $12,000.00
<br />2 CLEARING ACRE 1.1 $4,500.00 $4,785.00
<br />3 GRUBBING ACRE 1.1 $4,200.00 $4,466.00
<br />4 REMOVE CURB AND GUTTER LIN FT 40 $7.10 $284.00
<br />5 REMOVE CONCRETE WALK SQ FT 160 $4.50 $720.00
<br />6 COMMON EXCAVATION (P)CU YD 1130 $15.00 $16,950.00
<br />7 GRANULAR BORROW TN 253 $13.00 $3,286.02
<br />8 GEOTEXTILE FABRIC TYPE V SQ YD 411 $2.50 $1,027.29
<br />9 AGGREGATE BASE CLASS 5 MOD TON 740 $18.50 $13,690.00
<br />10 TYPE LV 4 WEARING COURSE MIXTURE (B)TON 220 $76.00 $16,720.00
<br />11 BITUMINOUS DRIVEWAY REPAIR SF 48 $25.00 $1,200.00
<br />12 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT 24 $3.75 $90.00
<br />13 BITUMINOUS MATERIAL FOR TACK COAT GALLON 86 $1.50 $129.00
<br />14 15" RC PIPE CULVERT CLASS V LIN FT 75 $32.00 $2,400.00
<br />15 15" RC PIPE APRON EACH 2 $240.00 $480.00
<br />16 CONST. DRAINAGE STRUCTURE, 4' DIA MH EACH 1 $2,000.00 $2,000.00
<br />17 4" CONCRETE WALK SQ FT 25 $5.50 $137.50
<br />18 6" CONCRETE WALK SQ FT 160 $6.75 $1,080.00
<br />19 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 40 $27.00 $1,080.00
<br />20 TRUNCATED DOME PANEL SQ FT 16 $31.00 $496.00
<br />21 LIGHTING UNIT TYPE SPECIAL 1 EACH 2 $4,300.00 $8,600.00
<br />22 LIGHTING UNIT TYPE SPECIAL 2 EACH 18 $1,800.00 $32,400.00
<br />23 CONDUIT SYSTEM (LIGHTING) TYPE 1 LUMP SUM 1 $10,000.00 $10,000.00
<br />24 SERVICE CABINET EACH 1 $6,000.00 $6,000.00
<br />25 TRAFFIC CONTROL LUMP SUM 1 $4,000.00 $4,000.00
<br />26 ZEBRA CROSSWALK WHITE-EPOXY SQ FT 54 $14.00 $756.00
<br />27 PERENNIAL 1 GAL CONT PLANT 50 $13.50 $675.00
<br />28 DECIDUOUS SHRUB NO 2 CONT SHRUB 8 $40.00 $310.00
<br />29 LANDSCAPE EDGING, METAL LIN FT 30 $5.50 $165.00
<br />30 MODULAR BLOCK RETAINING WALL SQ YD 40 $230.00 $9,200.00
<br />31 SEEDING, INCL SEED, MULCH AND DISK ANCHOR AC 1.1 $2,300.00 $2,454.10
<br />32 SEEDING, TYPE 2 AC 0.3 $9,000.00 $2,520.66
<br />33 NATIVE SEEDING MAINTENANCE LUMP SUM 1 $8,000.00 $8,000.00
<br />34 SILT FENCE, TYPE MACHINE SLICED LIN FT 250 $2.25 $562.50
<br />35 STORM DRAIN INLET PROTECTION EACH 1 $250.00 $250.00
<br />36 CLEAN PIPE CULVERT EACH 1 $250.00 $250.00
<br />37 CULVERT PROTECTION EACH 1 $350.00 $350.00
<br />38 RANDOM RIPRAP CLASS II CU YD 6 $100.00 $600.00
<br />39 SODDING TYPE LAWN SQ YD 685 $4.40 $3,013.37
<br />40 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 2200 $2.00 $4,400.00
<br />$177,527.44
<br />$8,876.37
<br />$186,403.81
<br />$50,329.03
<br />$236,732.84
<br />Construction Contingency (5%)
<br />Total Construction Cost - Segment 2
<br />Engr, Fiscal, & Admin (27%)
<br />Total Segment 2 Cost
<br />TRAIL SEGMENT 2 - WOODALE DRIVE TO COUNTY ROAD H2
<br />Sub-Total Segment 2
<br />A-2
|