Laserfiche WebLink
NO.DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE <br />1 MOBILIZATION LUMP SUM 1 $12,000.00 $12,000.00 <br />2 CLEARING ACRE 1.1 $4,500.00 $4,955.70 <br />3 GRUBBING ACRE 1.1 $4,200.00 $4,625.32 <br />4 REMOVE CURB AND GUTTER LIN FT 40 $7.10 $284.00 <br />5 REMOVE CONCRETE WALK SQ FT 180 $4.50 $810.00 <br />6 REMOVE METAL APRON EACH 2 $100.00 $200.00 <br />7 COMMON EXCAVATION (P)CU YD 1290 $15.00 $19,350.00 <br />8 GRANULAR BORROW TN 443 $13.00 $5,760.89 <br />9 GEOTEXTILE FABRIC TYPE V SQ YD 335 $2.50 $837.11 <br />10 AGGREGATE BASE CLASS 5 MOD TON 602 $18.50 $11,144.40 <br />11 TYPE LV 4 WEARING COURSE MIXTURE (B)TON 176 $76.00 $13,376.00 <br />12 BITUMINOUS DRIVEWAY REPAIR SF 120 $25.00 $3,000.00 <br />13 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT 24 $3.75 $90.00 <br />14 BITUMINOUS MATERIAL FOR TACK COAT GALLON 70 $1.50 $105.00 <br />15 15" RC PIPE CULVERT CLASS V LIN FT 75 $32.00 $2,400.00 <br />16 15" RC PIPE APRON EACH 2 $240.00 $480.00 <br />17 15" RC PIPE SEWER DES 3006 CL V LIN FT 70 $40.00 $2,800.00 <br />18 CONST. DRAINAGE STRUCTURE, 4' DIA MH EACH 1 $2,000.00 $2,000.00 <br />19 4" CONCRETE WALK SQ FT 205 $5.50 $1,127.50 <br />20 6" CONCRETE WALK SQ FT 160 $6.75 $1,080.00 <br />21 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 40 $27.00 $1,080.00 <br />22 TRUNCATED DOME PANEL SQ FT 16 $31.00 $496.00 <br />23 INFORMATION SIGN (SPECIAL)EACH 1 $3,700.00 $3,700.00 <br />24 LIGHTING UNIT TYPE SPECIAL 1 EACH 2 $4,300.00 $8,600.00 <br />25 LIGHTING UNIT TYPE SPECIAL 2 EACH 16 $1,800.00 $28,800.00 <br />26 CONDUIT SYSTEM (LIGHTING) TYPE 1 LUMP SUM 1 $10,000.00 $10,000.00 <br />27 SERVICE CABINET EACH 1 $6,000.00 $6,000.00 <br />28 TRAFFIC CONTROL LUMP SUM 1 $4,000.00 $4,000.00 <br />29 PERENNIAL 1 GAL CONT PLANT 60 $13.50 $810.00 <br />30 DECIDUOUS SHRUB NO 2 CONT SHRUB 8 $40.00 $320.00 <br />31 LANDSCAPE EDGING, METAL LIN FT 35 $5.50 $192.50 <br />32 SEEDING, INCL SEED, MULCH AND DISK ANCHOR AC 1.0 $2,300.00 $2,352.90 <br />33 SEEDING, TYPE 2 AC 0.1 $9,000.00 $1,329.13 <br />34 NATIVE SEEDING MAINTENANCE LUMP SUM 1 $8,000.00 $8,000.00 <br />35 SILT FENCE, TYPE MACHINE SLICED LIN FT 100 $2.25 $225.00 <br />36 STORM DRAIN INLET PROTECTION EACH 1 $250.00 $250.00 <br />37 CLEAN PIPE CULVERT EACH 2 $250.00 $500.00 <br />38 CULVERT PROTECTION EACH 2 $350.00 $700.00 <br />39 RANDOM RIPRAP CLASS II CU YD 6 $100.00 $600.00 <br />40 SODDING TYPE LAWN SQ YD 558 $4.40 $2,455.53 <br />41 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 2000 $2.00 $4,000.00 <br />$170,837.00 <br />$8,541.85 <br />$179,378.85 <br />$48,432.29 <br />$227,811.13 <br />TRAIL SEGMENT 3 - EDGEWOOD DRIVE TO LONG LAKE ROAD <br />Sub-Total Segment 3 <br />Construction Contingency (5%) <br />Total Construction Cost - Segment 3 <br />Engr, Fiscal, & Admin (27%) <br />Total Segment 3 Cost <br />A-3