My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/08/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/08/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:19 PM
Creation date
7/9/2018 5:41:11 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/2/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
8/2/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUARTERLY REPORT <br /> PAGE TWO <br /> AUGUST 2, 1993 <br /> 7 . Held turf sweeper demonstrations prior to final purchase. <br /> 8 . Cleared the left-over debris from the water tower project at <br /> City Hall. <br /> 9 . Completed work on the disc golf course in time for the May <br /> tournament event and Star of the North Games. <br /> 10. Mowing, mowing, and more mowing. This Spring and Summer <br /> continue to be excellent for turf growth - plenty of rain. <br /> The grass growth hasn't let up during this time - meaning <br /> continual mowing. <br /> 11. Equipment repairs. The mowers are getting lots of daily use <br /> and needless to say they have broken down a few times - - <br /> some times requiring outside repairs to be done, and <br /> sometimes our crew have been able to do the necessary <br /> repairs. Unfortunately, the grass doesn't stop growing when <br /> the mowers are down. <br /> 12 . Arrangements were made for the specifications and financial <br /> end of purchasing a big trailer for hauling the mowers and <br /> other equipment. <br /> 13 . Two Eagle Scout projects were supervised, one for the <br /> improvements to City Hall VB Courts and one concluding the <br /> park building interior painting. <br /> 14. Field grooming is a daily task, often grooming 10 - 13 <br /> fields each day in preparation of evening games and <br /> activities. <br /> 15. Trimming of weeds with machine and later through chemical <br /> application. <br /> 16. Turf work was unfortunately delayed longer than we had hoped <br /> because of the weather. Chemical applications require dry, <br /> calm circumstances and the weather simply did not cooperate. <br /> Rather than waste money on possible washed out applications <br /> during insufficient conditions and rather than risking the <br /> chance of damage due to spillage from windy conditions, we <br /> chose to wait for the appropriate conditions. <br /> 17. Again, the fields were so soft due to unusual amounts of <br /> rain work. Work at Edgewood School baseball field <br /> improvements and other park turf work including aeration, <br /> chemical applications and fertilizing has been delayed for <br /> fears of ripping up the existing turf with the machinery. <br />
The URL can be used to link to this page
Your browser does not support the video tag.