My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2008/11/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2008
>
Agenda Packets - 2008/11/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:13 PM
Creation date
7/10/2018 11:49:36 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/24/2008
Supplemental fields
City Council Document Type
City Council Packets
Date
11/24/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
November 24, 2008 Item No. 7J <br />Page 3 <br />x The spacing of lighting units was increased as directed by City Council at <br />their July 7, 2008 Work Session. <br />x The seed restoration was reduced further in scope. The initial plan for <br />seeding was to expand seeding areas and mixes in attempt maintain the <br />theme that had been developed by the restoration work done with the <br />construction of Trail Segments 9 and 10. The seeding areas were <br />reduced to only those areas disturbed during construction. This reduction <br />in seed area resulted in additional cost savings for the project. <br />Cost Estimate <br />The estimated project cost based on the scope of work as ordered by the City Council <br />under Resolution 7279 on June 9, 2008 was $1,274,512. <br />The following table shows the reduction in project cost achieved by the further <br />modifications in scope since that time: <br />County Road 10: Trail Segments 1-5 <br />Summary of Estimated Project Cost <br />Total Project Cost Estimate: <br />Feasibility Report (Reduced Scope) – June 9, 2008 $1,274,512 <br />Further reductions in scope:Cost Saving <br />Eliminating trail realignment – Segment A -$49,000.00 <br />Elimination of Retaining Walls -$25,300.00 <br />Increased Spacing of Lighting Units -$36,700.00 <br />Reduced Seeding Areas -$52,000.00 <br />Total Project Cost Savings Due to Reductions - $163,000 <br />Revised Report Cost with Reductions $1,111,512 <br />Current Engineers Estimate – Based on Plans $1,044,906 <br />The current estimated project cost, based on the construction plans, is $1,044,906. A <br />detailed cost estimate is included with this Staff Report. The estimate does include all <br />anticipated project costs such as design, inspection, administration, and legal. <br />The current estimated project cost is approximately 6% less than the cost estimate from <br />the reduced scope of the Feasibility Report.
The URL can be used to link to this page
Your browser does not support the video tag.