My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/10/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/10/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:41 PM
Creation date
7/17/2018 5:46:24 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/25/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
10/25/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- = Agenda Sec:on:9.C <br /> T194 <br /> REQUEST FOR. COUNCIL CONSiDERATION Raoort N, ner-93-656C <br /> Reoor Data: 10-21-93 <br /> STAFF REPORT Councl mon: <br /> "�"? 0 Soecal Order of Business <br /> CITY COUNCIL.FETING DATE October 25, 1993 Public Hearings <br /> 0 Consent Agenda <br /> Z Council Business <br /> • <br /> Item Description: Consideration of Patching Contract Approving Pay Request of $44,137.37 to <br /> Bituminous Consulting, Inc. <br /> Administrator's Review/Recommendation: <br /> - No comments to supplement this report <br /> - Comments attached. <br /> Explanation/Summary (attach supplement sheets as necessary.) <br /> SITMMARY; <br /> • <br /> On August 23, 1993, Council awarded the patching contract to Bituminous Consulting, Inc. for a <br /> sum of $33,547.75. Staff had mentioned that, due to the extended period of time between the <br /> spring inspections (marking of the patches), and date of award, some of the areas might be <br /> larger and require more material. Staff was very conservative in marking less than desirable <br /> surfaces, not knowing what the bid price would be. With these two items in mind, staff <br /> mentioned in a couple of issues of This Is It, that the contract would probably exceed the <br /> contract amount. By having an inspector on the job, the City was able to further determine <br /> whether to extend some repairs, resulting in a more effective, efficient use of funds, considering <br /> that Staff would not have to repair questionable areas that could result in temporary patching of <br /> potholes in the early spring and permanent patches during the next summer. In two streets, <br /> where major paving had occurred, there was no base material present. This was an item that <br /> staff could not have foreseen, but needed to be corrected. <br /> To date the City has received payment requests of approximately $50,150.00. Staff expects to <br /> receive about $7,000 more in payment requests. Staff realizes that this amount greatly exceeds <br /> the contract price, but wishes to stress that relatively little patching was performed in 1992 and <br /> the City awarded to the low bidder. All quantities were verified. and staff is very pleased with <br /> the quality and professionalism in which-the work was performed. <br /> Council had granted the Public Works Supervisor the authority to sign all change orders up to <br /> 10% of the awarded amount. Since this request has been exceeded, Staff requests that <br /> Council authorize the payment requests. <br /> / ,.. ------:2— <br /> Mike Ulrich, Public Works Supervisor <br /> Staff requests that Council approve the pay request of $44,137.37 to Bituminous Consulting, <br /> Inc. to be funded from Account No. 100-4270-705. <br />
The URL can be used to link to this page
Your browser does not support the video tag.