My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/12/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/12/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:31 PM
Creation date
7/17/2018 6:14:08 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/6/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
12/6/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Site Development Plan - <br />P.U.D. Concept and Development Stave <br />Site planning for the proposed Multi -Tech expansion is driven <br />by the desire to maintain the high corporate image of the <br />existing Multi -Tech facility, with the addition to be <br />consistent with the existing building in architectural style, <br />building materials and landscape treatment. The proposed <br />om the <br />addition would extend westerly approxi�2}eng advantage rof the <br />west wall of the existing building, <br />excellent visibility and exposure to Y.iahway 10, with views <br />overlooking the ponding area at the northwest corner of <br />Highway 10 and Woodale Drive. <br />The total floor area of the addition is 59,970 square feet, <br />consisting of a small (3,500 souare foot) single <br />vel <br />addition in the truck dock area at the northeast corner of the <br />building, and a two -level west addition with 2E,299 square <br />sresond <br />feet on the first floor and esentsl an u Elk f expansion a ofeCthe <br />floor. The addY <br />addition ep- <br />existing building floor area of 73,724 square feet, for an <br />e>:panded total building area of 133,694 square feet. The <br />building elevations feature continuation of the double banded <br />of <br />window patterr. of the existing building, <br />a second two-story sky -lit atrium entrance s}metrical with and <br />identical to the main entry of the existing building. <br />The existing building is served by 26E parking stalls. The <br />proposed building addition will require the removal of 101 <br />stalls. Construction of 346 new parLng stalls will result in <br />a net gain of 245 stalls serving the addition. Total parking <br />spaces available after the addition will be 513 stalls, for a <br />ratio of 4.26/1,000. <br />Site landscaping is to be provided consistent with the <br />existing Multi -Tech site and the remainder of Mounds view <br />Business Par}:. The lspecieslto provideng eyear round s a ecolor. <br />evergreen and ty of <br />ornamental species <br />The landscaped berm constructed along County Road H-2 as part <br />of the Phase I development will be continued along the <br />northern portion of the Multi -Tech expansion site. Site <br />drainage will be handled by catch basins in the paved areas <br />and piping to the existing dray r vicepond to the building in the southeast <br />corner of the site. Delivery <br />continue to be provided at truck docks located at the <br />northeast corner of the existing building. The east wall of <br />this dock area will be moved approximately 45 feet further <br />east to allow for a 3,500 square foot expansion of the <br />receiving area. Iio additional truck docks are proposed to be <br />installed with the addition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.