My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2006/03/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2006
>
Agenda Packets - 2006/03/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:07 PM
Creation date
7/17/2018 5:27:11 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/27/2006
Supplemental fields
City Council Document Type
City Council Packets
Date
3/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 11 <br />ASI-3, ASI-5, ASI-12, and ASI-43: in the amount of $12,579.00. These ASI’s <br />represent changes to items related to doorways, door hardware, and the existing <br />hollow metal doorframes. <br /> <br /> Additional thirteen (13) new doors. Originally, as a cost saving measure, <br />these doors were not scheduled to be replaced. However, the original <br />door laminate was not available, there for these doors were replaced to <br />match the new doors. <br /> <br /> Minor additions to the hardware on the first floor restrooms (occupancy <br />indicators) and all of the exterior doors (latch guards). <br /> <br /> Substituting the originally specified lyptus veneer with cherry veneer. <br /> <br /> The addition of electric strikes to the City Hall entrance and to the Police <br />entrance. This is required hardware for the access control system. <br /> <br /> The prep work and painting required of the hollow metal door frames that <br />were not replaced. <br /> <br /> <br />Change Order No. 12 <br />ASI-11: in the amount of $12,051.00. This is for additional work to replace nine <br />(9) existing hot water heating coils. Upon completion of demolition, several of <br />these coils were found to be leaking and / or rusted to the point where they may <br />begin to leak in the near future. It was deemed necessary to replace all of the <br />coils as a precautionary measure. Authorization to initiate the replacement of <br />these coils was granted on February 27, 2006. <br /> <br /> <br />Change Order No. 13 <br />ASI-9: in the amount of $3,650.00. The original plan for correcting the drainage in <br />the Police Sally Port (room 142) was not feasible due to the condition of the drain <br />located in room 143, well room. As a result, this change order represents work <br />required to remove portions of the concrete floor in the Police Sally Port 142, <br />pour a new concrete floor (that slopes toward the overhead doors rather than <br />toward an interior wall) and the work required to replace the interior gypsum <br />board partition wall, which separates the office space from the Sally Port. <br /> <br /> <br />Change Order No. 14 <br />ASI-9: in the amount of $4,642.00. Upon further investigation, the original ceiling <br />design in the Lobby (room 101) was found to be incompatible with the new <br />ductwork, the new and existing sprinkler piping, the new and existing water <br />piping, and the existing structure. Consequently, the ceiling was redesigned to <br />accommodate these restrictions. The ceiling design in the Council Chambers
The URL can be used to link to this page
Your browser does not support the video tag.