Laserfiche WebLink
Mounds View City Council November 27, 2006 <br />Regular Meeting Page 6 <br /> <br /> 1 <br />Council Member Flaherty indicated that it irks him that the wording used states that it is 2 <br />inevitable that rework will be necessary. He then said that it seems to him that is a blank check. 3 <br />He further said that the contractors and architects need to stand beside their quotes and Staff 4 <br />needs to tell them that there is not another dime coming. 5 <br /> 6 <br />Council Member Flaherty said that he would like further information on ASI 106 for 7 <br />clarification. 8 <br /> 9 <br />Public Works Director Lee explained that Staff is contesting some of the items under ASI 106. 10 <br /> 11 <br />Council Member Stigney asked if the signage is in front of City Hall or what the signage 12 <br />reference is for. 13 <br /> 14 <br />Public Works Director Lee indicated that SEH is proposing to either repaint that signage or add a 15 <br />backer to make it more visible. He then said that the Council dais and outside signage is coming 16 <br />back to Council for consideration. 17 <br /> 18 <br />Council Member Flaherty asked about ASI 95 and then said that the building officials are in the 19 <br />building and asked whether they were conferred with when the plans were prepared. 20 <br /> 21 <br />Public Works Director Lee indicated that a permit was issued by the Building Inspector based on 22 <br />the plans submitted. 23 <br /> 24 <br />Mayor Marty indicated that Council Member Flaherty had said that it is inevitable that minor 25 <br />adjustments must be made to the scope of the project and he agrees with that but now the City 26 <br />has been back in for a while so he would think that everything would have been done by now. 27 <br /> 28 <br />Mayor Marty said that someone needs to be held accountable for this because things just keep 29 <br />coming on this project and he continues to be concerned about the things that keep popping up. 30 <br /> 31 <br />Council Member Gunn indicated that she had asked if all the items are done but Arcay has 32 <br />continued to submit items submitted by subcontractors and she would like to know if the 33 <br />contractors are inspecting or if Staff is finding these things or how these things are coming up. 34 <br /> 35 <br />Public Works Director Lee indicated that there was a meeting with Staff, Arcay and SEH to 36 <br />finalize the items. He then said that after the final four items to come with the next change order 37 <br />there will be no more items coming forward. 38 <br /> 39 <br />Council Member Flaherty said that all piping gets insulated in Minnesota and it should come 40 <br />standard with the bid and it should not have been an oversight. 41 <br /> 42 <br />MOTION/SECOND: Marty/Stigney. To Waive the Reading and Approve Resolution 6965 43 <br />Approving Change Order No. 36 for the City Hall Rehabilitation Project with the Caveat that 44 <br />ASI 106 Must be Verified by the Consultant. 45