Laserfiche WebLink
EMERGENCY GENERATOR FOR THE BOOSTER STATION <br /> The emergency generator would allow use of the booster <br /> station and the 2 million gallons of water stored in the <br /> reservoir during emergency situations where electrical <br /> service is interrupted. This would include the necessary <br /> automatic switching gear and wiring. <br /> LONG LAKE ROAD WATER MAIN CROSSING <br /> This would pay for including a 12 inch water main in Long <br /> Lake Road crossing Highway 10. This would improve pressure <br /> distribution during high flow periods. This project has been <br /> under consideration for over 10 years and has been <br /> considered to be a part of a reconstruction project for Long <br /> Lake Road. <br /> The costs of these projects are listed below: <br /> Treatment Plant #1 $1,350,000 <br /> Treatment Plants #2 & 3 500,000 <br /> Test Well #4 18,000 <br /> Rehabilitation of Well #4 50,000 <br /> Well #4 Transmission Line 126,000 <br /> Emergency Generator 80,000 <br /> Long Lake Road Water Main 125 .000 <br /> Total $2,249,000 • <br /> • <br /> • <br />