Laserfiche WebLink
<br />12. Elevation on ballfield and repair drainage ditch at Lambert Park. Park <br />Foreman Recommendation. C – 2007 ($25,000) <br /> <br />13. Pave the pathway on the northwest corner of Hillview and Quincy at <br />Oakwood Park. Suggested during May 8, 2003 park tour. C – 2007 <br /> <br />14. Determine the feasibility of developing a small soccer field at the <br />northwest corner of Hillview and Quincy at Oakwood Park. Suggested <br />during May 8, 2003 park tour. C – 2006 ($20,000+$4,000) <br /> <br />15. Park Building at Random Park – replace existing building. CIP 2010 <br />design / 2011 construction C – 2012 ($250,000 - $20,000 in 2012 for <br />Design/ $230,000 in 2013 for Construction) <br /> <br />16. Random Parking Lot – reconstruct the parking lot. C – 2008 ($30,000) <br /> <br />17. Resurface parking lot at Silver View Park. C – 2008 ($50,000) <br /> <br />18. Paved trail at Woodcrest Park. C – 2007 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />