My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-20-1997
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1997
>
08-20-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 5:24:23 AM
Creation date
8/1/2018 5:23:25 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
8/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
} <br /> Silverview Estates Dev.Co. <br /> Preliminary Plat&Development Review <br /> Planning Cases 501-97 and 502-97 <br /> . <br /> August 20, 1997 <br /> Page 3 <br /> concept plan stage. Therefore,regardless of the number of square feet, the building mass and <br /> general design have not changed. Additionally, the senior housing structure reflected in both <br /> the concept plan and the development stage plan are respective of the established setbacks. <br /> As such,the necessary amendment to the PUD reflects a modification to the square footage <br /> number to reflect the building footprint. <br /> • Information needs to be submitted to assist in the determination of pervious versus impervious <br /> surfaces for each of the sites within the PUD. <br /> Applicant's Response:I may have those exact figures by the August 20th meeting. The data <br /> will be on the revised site plan for September 3'd Again, it is our intent to abide by the <br /> conditions of the PUD document. <br /> • All plan sheets that depict building elevations need to be modified to include finished building <br /> height. <br /> • Color and materials boards and architectural renderings are required as part of the development <br /> stage plan submittal. <br /> • Applicant's Response: Colored elevations of all buildings will be presented at the Planning <br /> Commission meeting. The data will be on the revised site plan for September 3'd Again, <br /> it is our intent to abide by the conditions of the PUD document. Building materials will be <br /> presented to the Planning Commission on August 20th as well as architectural renderings of <br /> each building. It is our intent to coordinate building materials and color throughout the <br /> PUD. <br /> • The site plans for the two-story office building, the one-story office building and the senior <br /> housing structure do not indicate a location or construction type for trash and recycling <br /> enclosures. <br /> Applicant's Response: The site plan shows a trash enclosure adjacent to the C-store. All <br /> other buildings have been designed to handle trash inside. <br /> • The site plan sheet 1 of 1 indicates a 10-foot setback for the parking area along Silver Lake Road <br /> in front of the senior housing building. The minimum setback required in the PUD is 30 feet. <br /> Applicant's Response: This was an oversight. We have ample parking to make the <br /> appropriate adjustment to provide a 30 foot setback along Silver Lake Road <br /> • The detailed landscaping plan that is required for submittal at this stage requires that the plan <br /> • show species, numbers and sizes of all plant material. The"preliminary planting plan" that has <br /> been submitted does not indicate sizes, does not recognizeincorporation of existing trees that will <br /> be preserved on site, and does not specify location for plant species. <br />
The URL can be used to link to this page
Your browser does not support the video tag.