Laserfiche WebLink
11 <br />• Made preparations for water tower rehabilitation <br />• Ran test run on hooking up to New Brighton water supply <br />• Constructed report on the City’s meter reading system <br />• Crow worked the State Fair water booth <br />• Gathered information on off-peak electric consumption and savings <br />• <br />Well # 1 <br /> Did not run in September due to switching to discharge pressure <br />Well # 2 <br /> Replaced cooling line on cat engine <br />Well # 3 <br /> Repaired ice machine <br />Well # 4 <br /> Removed chlorine tanks, injectors, and cylinder units <br />Well # 5 <br /> Repaired main gates <br /> Rebuilt chlorine injector <br /> Rebuilt SO2 Cylinder unit <br />Well # 6 <br /> Repaired main gate <br /> Replaced incandescent lights with fluorescent lights <br /> Ran new ¼” line on control valve <br />Booster Station <br /> Had service work done on the Onan generator <br /> <br />Sanitary Sewer <br /> <br />• Cleaned and Televised Sanitary and Storm Sewer Lines <br />• Repaired Camera <br />• Chemically treated roots <br />• Assisted in repair of broken sewer lines <br />• Assisted Parks Department with cleanup from Festival in the Park <br />• Assisted Water Department in water meter reading unit repairs <br />• Cleaned Shop <br />• Initiated and receive bids on gas monitor; purchased a monitor <br />• Began fall root cutting and cleaning <br />• Cleaned lift stations <br />• Maintained Vactor <br /> <br />Surface Water <br /> <br />• Changed/Replaced Cl2 & So2 tanks and well houses/filter plant <br />• Repaired & rebuilt (internally) catch basins <br />• Replaced broken catch basin hoods