My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2002/05/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2002
>
Agenda Packets - 2002/05/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:58 PM
Creation date
8/14/2018 5:58:28 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/13/2002
Supplemental fields
City Council Document Type
City Council Packets
Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Expansion Joints -- <br />Expansion joints have been added to the plans and specifications. These allow <br />for the expansion and contraction of the paved surface and increases it’s <br />longevity. <br /> <br />Driveway Relocation and / or Altering its Width -- <br />A concrete driveway apron will be provided for each driveway as part of this <br />project. During the construction phase of this project, property owners will have <br />an opportunity to alter their driveway if they wish to do so. <br /> <br />Mail Box Posts -- <br />In accordance with Municipal Code Section 202.09, Subdivision 2, Item J, <br />mailboxes will be grouped on gang posts in numbers logical to the spacing <br />required and the cost added to the project (Ordinance 654, 2-14-2000). To <br />improve the appearance of the boxes mounted on these posts, the City will <br />encourage property owners to purchase like mailboxes. <br /> <br />Metro Transit Factors -- <br />Metro Transit has reviewed the bus stops along the H2 project. They have <br />determined that the two bus stops at Red Oak Drive (north and south side) <br />should be eliminated, however, all other stops must remain. <br /> <br />As a transit amenity and to promote safety, the City will be adding concrete <br />pedestrian pads at the various bus stops. This will allow patrons to stand at a <br />safe distance from the traveled lanes of traffic. <br /> <br />Cross walks and ramps -- <br />Cross walks ands pedestrian ramps were added to meet state and federal <br />requirements such as the Americans with Disabilities Act. <br /> <br />Other Notable Items <br />Neighborhood Meeting -- <br />A “Neighborhood Pre-construction Meeting” will be held shortly after the City has <br />awarded the contract and discussed schedules and details of construction with <br />the contractor. The Public Works Department will discuss details of the project <br />with concerned property owners and will address "commonly asked questions" <br />and any concerns they may have. <br /> <br />Temporary Construction and Permanent Easements -- <br />City will need to obtain a temporary construction and permanent easements as <br />part of this project. This has the potential of being an arduous task. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.