Laserfiche WebLink
Item 05C <br />Page 4 <br /> <br />About 40% of the 34.5 acre property is wooded, and is <br />enough to compensate for lost trees. <br /> <br />Screening & Buffering Within the R-1 district, no screening or buffering is <br />required. <br /> <br />Lighting Glare from exterior light cannot exceed 1.0 foot candle <br />(fc) measured at the centerline of a street, and 0.4 fc <br />measured at an adjacent residential property line. <br /> <br />The lighting plan includes measurements taken within <br />the school property, but not beyond. The plan indicates <br />0.5 fc measured at the school property line. It is likely <br />that glare is well within limits, if measured at homes <br />across the street. <br /> <br />Setbacks5 <br /> Required Proposed <br />Front 35’ 28.9’* <br />Rear 30’ 930’ (approx.) <br /> <br />* Existing pool building has a non-conforming <br />setback. Excluding the pool, the building is set back <br />91.5’ from the Edgewood Dr ROW. The building is <br />set back about 300’ from Woodale Dr ROW, and <br />about 315’ from the Co Rd H ROW. <br /> <br />Exterior Const. Design & Materials Brick façade will match existing brick façade, with metal <br />accents at major door entrances. <br /> <br />Trash Disposal At loading dock in the NW corner of the building. <br /> <br />Construction Timetable Construction is planned, Fall 2018 thru July 2020, and <br />during the summer of 2021. <br /> <br />Development Agreement City Attorney to determine if one is necessary. <br /> <br /> <br />Summary <br />The Mounds View School District has proposed additions onto Edgewood Middle School, including a <br />swimming pool, gymnasium, classrooms, and parking lot expansions. The project requires a <br />Development Review, which is a review for compliance with City Code requirements. <br /> <br /> <br />5 City Code, Section 1106.04, Subd 1 (Conditional Uses: Public or semi-public buildings…)