Laserfiche WebLink
-4- <br />13. Two pathway bridges - one bridge to <br />be replaced with a culvert due to a <br />request by the public works department <br />and approved by the City Council. <br />Staff requested that the Commission review <br />proposed items for Silver View Park and make <br />any additions or changes: <br />1. Large picnic shelter with water, sewer <br />and electricity - the Commission <br />strongly stated that this was of the <br />utmost importance to the usability of <br />the park and that the installation of the <br />water, sewer and electricity should <br />coincide with the construction of the <br />picnic shelter. <br />2. Play equipment with accessibility for <br />walking impaired persons. <br />3. Twin sand volleyball court. <br />4. Horseshoe pits. <br />5. Exercise course along the pathway <br />north on the side of the pond - <br />Commissioners didn't feel that this was <br />a high priority item. <br />6. Bituminous pathway around the upper <br />portion of the park, connecting activity <br />areas. <br />7. Water fountain near athletic fields. <br />8. Gazebo type construction near softball <br />fields. <br />9. Bleachers for soccer field and softball <br />field spectators. <br />10. Softball field scoreboard. <br />11. Additional picnic tables and grills. <br />12. Bike racks. <br />