My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2023/03/03
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
Agenda Packets - 2023/03/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:48 PM
Creation date
3/7/2023 10:21:54 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/3/2023
Supplemental fields
City Council Document Type
Packets
Date
3/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chapter 1. INTRODUCTION <br />This report describes the development and implementation of a tool to estimate the effects of <br />heavy vehicles on local roads. The main focus of the tool is to determine the effects of <br />additional heavy vehicles that were unknown and could not have been considered at the time the <br />roadway and pavement were designed. This situation could arise due to new commercial <br />facilities bringing additional vehicles on a permanent basis, the temporary additional heavy <br />vehicles required for some major construction activities, the location of new mining activities <br />and associated haul routes, or for other causes. <br />The tool developed as part of this project compares the impact of the vehicle loading that was <br />expected when the pavement was designed to the impact of vehicle loading including additional <br />vehicles associated with newly constructed or conceived traffic generators. <br />Project Objectives <br />The primary objective of this project was to develop an analysis method and a corresponding <br />tool for local road and highway agencies to use when evaluating the impact of heavy vehicles <br />and large volumes of traffic. Often the vehicles under consideration are comprised of large <br />volumes of unexpected vehicles attributable to specific developments or events, such as the <br />construction of a new warehouse or distribution center, development of wind energy farms, etc. <br />Report Content <br />The report describes the activities of the research team over the duration of the project, the <br />development of the associated tool, and the interactive training program utilized for its <br />implementation and dissemination. The remainder of this chapter includes a review of literature <br />relating to the evaluation of impacts on pavements due to heavy vehicles. Chapter 2 describes <br />the development of the analysis methods incorporated into the tool for assessing the impacts of <br />additional heavy vehicles. Chapter 3 presents the analysis tool and its development and intended <br />use. Chapter 4 presents conclusions and recommendations for the tool's proper use, and <br />suggestions for future development. <br />Literature Review <br />This section includes the review of literature and of other tools for evaluating the effects of <br />heavy vehicles on local roads and city streets. Through the review of the literature and <br />knowledge of pavement design, analysis, and performance, it is clear that three parameters have <br />the greatest effect on the pavement condition and longevity. These include the characteristics of <br />traffic, pavement materials (and construction practices), and the environment. Each of these are <br />discussed below, as well as other topics including various methods of pavement design, types of <br />damage caused by vehicles and by the environment, and the expected impacts on the pavement <br />life. <br />Much of the discussion in this review draws on work from the Heavy Traffic Generators Project <br />(1) funded by the Minnesota Local Road Research Board. That work focused on the impacts of <br />wind turbine construction on county roads. There are similarities and differences between this <br />work and the Wind Tower project. The primary similarity is the way the two analyze impacts on <br />pavement due to heavy vehicles. Some of the differences include the pavement sections (rural <br />
The URL can be used to link to this page
Your browser does not support the video tag.