My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/24/81 Agenda & Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
1980-1989
>
1981
>
09/24/81 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 1:46:04 PM
Creation date
4/24/2023 1:25:47 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Park Shelter Buildings • <br /> Page 4 <br /> September 22, 1981 <br /> 2. (continued) <br /> The major drawback to using temporary trailers is that they cannot guarantee <br /> delivery or accept advance reservations . They did not feel this would be a <br /> major problem as the buildings are mainly used for summer construction crews <br /> so there should be an ample supply of trailers. <br /> 3. Staff's third recommendation is to purchase and construct a new building at <br /> Lambert Park. Lambert was chosen to recieve a new building because it would <br /> take a minimal amount of earth work and utility work to relocate the building <br /> as proposed on the master plan. <br /> The building staff is proposing is the Game Time circle eight building which is <br /> a 32' octagonal building with 902 square feet. The building is outlined in some <br /> depth on pages 85 - 87 of the Game Time catalogue, as well as the separate Game <br /> Time building brochure. • <br /> The basic building cost for both the 24' (549 square feet) and 32 ' are as follows : <br /> 24' (549 so. ft. ) 32 ' (902 sq. ft. ) <br /> Basic Building $7,425. $9,363. <br /> Insulation Package R-13 $1 ,242. $1,963. <br /> Concrete Slab $3,200. $4,000. <br /> Plumbing $1 ,500. $1 ,500. <br /> Electrical $1 ,500. $1 ,500. <br /> Exterior Walls or Panels $4,078. $5,112. <br /> Interior Partition $2,272. $3,014. <br /> Freight $1 ,500. $1 ,500. <br /> Sub total $22,717. $27,952. <br /> Estimated Construction Cost $3,000. $4,000. <br /> Total Cost $25,717. $31 ,952. <br /> If we are able to order prior to 1982 they will reduce the cost by $1 ,000. In • <br /> addition , the Jaycees have indicated they would be willing to assist with the <br /> construction of the building which would greatly reduce our estimated construction <br /> costs . <br />
The URL can be used to link to this page
Your browser does not support the video tag.