Laserfiche WebLink
MEMO TO: Larry Decheine <br /> DATE: May 13 , 1982 <br /> • PAGE : Three <br /> EDGEWOOD PARK SCHOOL <br /> The city will be using all four fields at Edgewood during the entire <br /> Summer . Although the School District will perform the major maintenance , <br /> i .e . lawn mowing, etc . , the city will be responsible for field lining, <br /> and general maintenance of the field area. <br /> *1 . We need players benches down on Field #3 as soon as possible . <br /> Please contact Cliff Kardell at School District to find out where <br /> they have placed them. <br /> 2 . The barrels should be emptied on a weekly basis . <br /> 3 . Check the tennis court nets on a weekly basis to ensure that they <br /> are in working order, and that the coin operating boxes have not <br /> been damaged. Should the coin-operating boxes be damaged, please <br /> report that to myself so I may deal with the School District on <br /> that particular issue . <br /> RIDGE LANE PARK <br /> *Other than mowing of the park area, please be careful of the twelve <br /> additional willows that were placed on the sight . We should be <br /> • filling the area with some of the fill from drudge material from <br /> across the street and have the park area mowed as soon as possible . <br /> LAMBERT PARK <br /> *1 . The tot lot area should be sprayed again with Round-up and the <br /> weeds pulled from the area to eliminate them. <br /> 2 . The entire park area should be cleaned up, there is a large amount <br /> of glass under a small Canada Red Cherry Tree just east of the <br /> tot lot area. <br /> 3 . Stenkel Construction will be installing the building during the <br /> next two weeks as you are aware and a continual or daily check <br /> up of the area to ensure there is no problem regarding vandalism, <br /> footings , building construction, in general , should be taken <br /> care of. <br /> *4 . The players bench and bleachers behind the backstop , the middle <br /> bench is broken and should be repaired. <br /> 5 . The trash in general should be picked up from the park area. <br /> 6 . There is a great deal of standing water which would be on the <br /> south end of the football field. You may want to see if you can <br /> • pump it out of there to eliminate a possible mosquito breeding <br /> ground. This is not a high priority but it ' s a project that if <br /> you have time, you can get to . <br /> A good Summer CETA project would be to build a retaining wall in the <br /> northwest corner of the park where the hockey rink goes to eliminate <br /> the errosion. <br />