Laserfiche WebLink
6. New Business: <br /> <br />a.) County Road 10 Trailway Project: Segments 9&10 Plan Review – Review the draft plans and provide <br />recommendation. <br />- Drinking Fountain – include? <br /> <br />b.) County Road 10 Trailway Project: Segments 1 -5 DNR Grant Application – The City will be submitting <br />a DNR Trailway grant application for this project. Letters of support from various agencies (including <br />the Commission) will increase our probability of being successful. <br /> <br />c.) Set 2007 Meeting Dates – a draft schedule has been developed with the meeting scheduled for the forth <br />Thursday of the month (except for November and December) <br /> <br />d.) Commission to recommend a Chairperson, Appoint a Vise-Chairperson, and Secretary <br /> <br /> <br /> <br />7. Commissioner/Staff Reports: <br />a) Random Park Building Status Report <br />As part of an Eagle Scout Project, the interior space of the Random Park Building was primed this <br />last weekend. The process went well. The same group will be painting the building next Saturday. <br />The carpet contractor will be installing the carpet on Thursday, December 29th. <br /> <br />b) Groveland Park Building Status Report <br />There was a glitch with the overhang; the material was not thick enough to accommodate the length <br />of nails specified. The contractor had to put a layer of 5/8" plywood on the overhang before it could <br />be shingled. The rest of the project is going well. The A/C unit has been installed and most of the <br />mechanical work nearly completed. <br /> <br />There was vandalism at Groveland shelter over the weekend, two screens were slashed and one <br />window was broken. <br /> <br />c) Indoor Playground Equipment at the Mounds View Community Center Report <br />The playground equipment has been put together. There just needs a few things tweaked and the <br />foam covering can be installed. <br /> <br />There was an issue with the fire sprinklers heads being blocked by the play equipment. The <br />sprinkler heads above the equipment have been changed out and replaced with recessed heads that <br />are covered with a plate until they pop out for a fire. This solution has been accepted by the City’s <br />Fire Marshal. <br /> <br />d) Skating Rink Update <br />Weather permitting; the City is planning on opening the skating rinks the day after Christmas. <br /> <br />e) Rental Fee Structure <br />The Rental Fee Structure, as submitted by the Parks and Recreation and Forestry Commission, was <br />th <br />approved by the City Council on December 11. These fees go into effect on January 1, 2007. <br /> <br /> <br /> <br /> <br />