Laserfiche WebLink
projects identified as corrective actions in Table 6.3 are for future implementation and are not scheduled <br />within the City's 5-year capital improvement plan, and no cost estimates have yet been developed. These <br />are shown below as post-2028, and costs are to be determined (TBD). As noted in Table 6.3, Activity <br />#10, JD1 channel restoration at Lois Lane, will require consultation with RCWD to ensure any <br />modifications to the public ditch system follow RCWD process and meet statutory requirements <br />Table 8.3 - System Improvement Activities Listed by Activity Category <br />Activity <br />Category <br />Project <br />Description <br />Est. <br />Est. <br />ResponsibleActivity <br />Capital <br />Woodcrest Park <br />Remove sediment from <br />1 <br />Improvement <br />basin/swale <br />basin and swale and <br />2021 <br />$50,000 <br />City <br />restoration <br />restore channel <br />2 <br />Capital <br />Ardan Avenue <br />Remove sediment and <br />2021 <br />$50,000 <br />City <br />Improvement <br />channel restoration <br />restore drainage corridor <br />3 <br />Capital <br />Silver View Pond <br />Evaluate pond <br />2024 <br />$50,000 <br />City <br />Improvement <br />reassessment <br />improvement options <br />Capital <br />Silver View Pond <br />Dredge the pond to <br />4 <br />Improvement <br />dredging <br />remove deposited <br />2027 <br />$2.1M <br />City <br />sediment <br />Capital <br />Silver View Pond <br />Install recirculating pump <br />5 <br />Improvement <br />water quality <br />and iron -enhanced bench <br />2030 <br />$100,000 <br />City <br />treatment <br />Capital <br />Quincy <br />Post- <br />6 <br />Improvement <br />Street/Hillview <br />Modify inlet structure <br />2022 <br />TBD <br />City, RCWD <br />Road inlet <br />Capital <br />Silver View Pond <br />Regrade and restore <br />Post- <br />7 <br />Improvement <br />slope stabilization <br />slopes with native <br />it <br />2028 <br />TBD <br />City <br />vegetation <br />Capital <br />Groveland Road <br />Construct outlet skimmer <br />Post- <br />8 <br />Improvement <br />wetland outlet <br />structure <br />2028 <br />TBD <br />City <br />skimmer <br />9 <br />Capital <br />Red Oak Court <br />Rebuild outlet structure <br />Post- <br />TBD <br />City <br />Improvement <br />basin outlet <br />2028 <br />Capital <br />JD1 channel <br />Stabilize channel, modify <br />Post- <br />10 <br />Improvement <br />restoration at Lois <br />outlet, evaluate need for <br />2028 <br />TBD <br />City, RCWD <br />Drive <br />additional flood storage <br />Capital <br />EW-5 basin <br />Modify outlet structure <br />Post- <br />11 <br />Improvement <br />improvements <br />provide <br />and pre additional <br />2028 <br />TBD <br />City <br />floodovidstorage <br />Capital <br />Longview Drive <br />Lower wetland EOF and <br />Post- <br />12 <br />Improvement <br />drainage <br />add pond outlet skimmer <br />2028 <br />TBD <br />City <br />improvements <br />structure <br />City of Mounds View 47 <br />Local Surface Water Management Plan Stantec Project No. 193804166 <br />5tantec <br />