Laserfiche WebLink
CASE 126-83 <br />Page 3 <br />3) Storm water from the motel si.tc is proposed Lo flow to the <br />catchment (holding) area near thu nouthurn property line and <br />flow to the east through the akinnncr and into an existing <br />storm sewer culvurL under Program Avunae and behind L•hc Country <br />Inn restaurant, eventually flowi.nq .into all Uxi.sting ditch south <br />of the Country Inn. The water ultimaLely flows into Rice Creek. <br />A drainage plan for the entire Programmed Land Addition will be <br />available at the meeting. <br />4) The City Cnginecr wilt review thu sLurm woWr runoff calculations <br />and pondi.ng volumes/arr_a for Lhi:o area w111:11 i ,-Coived. Approval <br />should be contingent• upon City Engineer approval. The Rice Creek <br />Watershed District will also be rev.iewinq Lhin proposal and a <br />permit issued as a condition prior to final approval by the City. <br />Landscaping: <br />1) The applicant• will be submitting a landscaping plan at a later <br />date. <br />Development• Agreement: <br />1) A development agreement should be wriLLen and bonding required <br />which includes the following: <br />a) concrete curb and gutter <br />b) paving <br />c) landscaping (sidewalk, plantings, sodding, etc.) <br />d) parking lot• striping <br />e) detention/catchment pond construction <br />Applicant revised his request to receive development approval to construct <br />a 98-unit motel with 70 units to be constructed initially as Phase I and <br />an additional 28 units to be constructed at the same time or at a future <br />date as Phase II. <br />