Laserfiche WebLink
COST ESTIMATE FOR M.S.A. PROJECT 1985 <br />CITY PROJECT 85-1 <br />PAGE. THREE OF THREE <br />................ <br />ITEM <br />. -- DESCRIPTI <br />36. 2506.509 STORM SEWER CONTROL <br />STRUCTURE EACH S. 1,000.00 <br />37. 2101.502 CLEARING 6" DIA. <br />TO 10" DIA. TREES EACH S. 90.00 <br />38. 2101.507 GRUBBING 6" DIA, <br />TO 10° DIA, TREES EACH f - 50.00 <br />39. 2356.505 BITUMINOUS MATERIAL <br />FOR SEAL COAT GAL. f`91 <br />40. 2356.507 SEAL COAT AGGREGATE <br />(FA-2) TON f_ 14.91 <br />41. 2341.516 EXCAVATE F. AND I. <br />3" THICK PATCHING SQ.YD. f 6.50 <br />42. 2503.541 15" R.C. PIPE SEWER <br />CLASS V L.F. 3 _ 25.00 <br />PAGE SUBTOTAL <br />ESTIMATED CONSTRUCTION COST <br />-..... - ..... ....................... <br />-._._.__„....................... SAP 146-229-04 NON -PARTICIPATING TOTAL <br />UNIT--- <br />ITY - TUTAL QUANTtiY TOTAL'- <br />QUANTITY TOTAL <br />------ -- -- L- <br />1 $ 1,000.00 0 S 0_00 1 S I,000.00 <br />2 S 180.00 10 f _900.00 12 S 1,G80.00 <br />2 $ _100.00 10 S 500.00 12 S 600.00 <br />0 $ 0.00 35,700 f 32.487.00 35,700 S 32,487.00 <br />0 S . 0_00 1,900 S 28,329.00 1,900 $ 28,329.00 <br />0 S 0_00 3,000 $19,500.00 3,000 S 19,500,00 <br />10 f 250.00 0 $ 0_00 10 f 250.00 <br />S 1,530.00 S 81,716.00 S 83,24 <br />5237,330.50 <br />COST ESTIMATE BY CITY OF MDUNDS VIEW <br />PUBLIC WORKS DEPARTMENT <br />ESTIMATED CONSTRUCTION COST SAP 146-229-04 <br />ESTIMATED PRELIMINARY ENGINEER1140 <br />ESTIMATED INSPECTION AND STAKING <br />CONTINGENCY <br />ESTIMATED TOTAL COST SAP 146-229-04 <br />USE <br />$124,901.50 <br />$237,330.50 <br />S 23,700.00 <br />S 18,900.00 <br />S 23.700.00 <br />5303,630.50 <br />$304,000.00 <br />f362,232.00 <br />Eli <br />