My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1988/11/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1988
>
Agenda Packets - 1988/11/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:53:24 AM
Creation date
4/9/2025 10:53:23 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/14/1988
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 10, 1988 <br />Mounds View City Council pace Six <br />Regular Meeting ------------------------ <br />----------------------- <br />------------- <br />Motion/Second: Hankner/Quick to <br />approve Resolution <br />10. eratioo-of <br />Consid <br />Resolution <br />Res luti <br />No. <br />2392, approving a conditional <br />use permit request <br />garage <br />No.2392 <br />for <br />Richard Hanson to construct an <br />oversized <br />Case No. 249-88, <br />at <br />8075 Sunnyside Road, Planning <br />and <br />waive the reading. <br />5 ayes 0 nays <br />City Planner Herman reported the Environmental11. <br />Assessment Worksheet was received by the City last <br />Friday. She added the developer, potential owner <br />and consultant were in attendance to make a presen- <br />tation tonight. <br />Philip Seipp, President of Sysco/Continental Minne- <br />seta, explained their company is in the business of <br />food service distribution, and he reviewed their <br />operation. Products are received in during the <br />day, loaded onto the docks at night and shipoed out <br />the next day. They have outgrown their present <br />facility anO anticipate the proposal of 240,000 s•f, <br />would handle their needs for the next five years. <br />The plan will be designed for expansion for future <br />needs. <br />Mr. Seipp stated it is very important to them that <br />the residents see this as a desirable and appropriate <br />use of land, and it be a harmonious relation -ship. <br />They expect to employ 300 people by the time they move <br />into the new facility, with eventual growth to 500. <br />Mr. Seipp stated they would ba eery willing to have <br />a public infotmational meeting before the public <br />hearing, to meet with the public and hear and address <br />their questions and concerns. <br />Scott Kinkade, of Ryan Construction Company, gave a <br />b.:ief overview of the design. 209,000 s.f. would be <br />warehouse space, with 35,000 s.f. of office space. <br />The layout or, the property has been planned to minimize <br />the impact on the wetland and be appealing in appearance. <br />Mr. Kinkade reviewed the lighting, signage, driveway <br />layout and material plans. He stated their goal for <br />occupancy is November 1989, which is driven by a number <br />of concerns, with one of those being the need to begin <br />grading before a har.. frccze <br />Dick Koppy, of Westwood Professional Services, Inc., <br />reviewed the storm drainage plans and preliminary <br />landscaping plans. He explained 90 percent of all <br />the water from the site will drain directly into the <br />pond they are proposing in the upland area, not the <br />existing wetland area. Mr. Koppy reviewed the <br />alternatives for providing water services to the site, <br />as well as the plans for sanitary sewer and site <br />lighting. <br />Motion Carri d <br />Receive Environ- <br />mental Assessment <br />Worksheet for <br />Sysco/Continental <br />Minnesota and <br />Authorize Submit- <br />tal to Minnesota. <br />Environmental <br />Quality Review <br />Board <br />H <br />
The URL can be used to link to this page
Your browser does not support the video tag.