Laserfiche WebLink
ENGINEERS I ARCHREC]S *PLANNERS <br />1,. • ^ FTA55117 6r 4E4-0272 <br />x <br />TO: CITY OF MOUNDS VIEW <br />ATTN: MARY SAARION <br />FROM: DAN BOXRUD <br />DATE: DECEMBER 10, 1987 <br />SUBJECT: ILVER VI8 <br />VIEW PARK <br />TRAIL <br />S <br />MEMORANDUM <br />I field checked the location where you plan to install additional <br />wood chip trail in Silver View Park on <br />hesouthwest sideue ofwthe <br />pond. My understanding is that you propose <br />northerlyltor <br />connect notohthe existing owood chipncrete trail westerly <br />fom the end Of the trailOn the <br />northwest corner of the pond. <br />t+ trail appears to have been constructed on <br />The existing wood chip <br />top of the existing ground. In certain locations, 'based <br />this has lot <br />the <br />potential for blocking drainage. <br />However, basnthat this <br />grades I saw west of the concrete walk, it appears <br />method of construction could be continued without blocking <br />drainage. The location of the trail would need to be carefully <br />picked so as to have enough cross slopthe ew owachipse won d not pond so that <br />the additional height created by <br />be <br />higher than the ground south of the trail. If the desired trail <br />routing does end up in a flatter area adjacent to the backsoil <br />lines, it may be desirable to dig the trail down into the top <br />so that the existing grade can be continued towstioard the pond. <br />n this <br />I believe this addresses Yoe gaquiren anything8efurther, you raid to meo please <br />proposed project. If <br />advise. <br />DRB:jms <br />CHIPPEWAFALLS <br />ST PAOL IvrCONSIN <br />SHORT ELLIOTT MINNESD:A <br />HENDRICCON INC. <br />